Practical response to geopolitical risk in international logistics and Marine Cargo Insurance involves identifying what must be reviewed, and in what order, when war, armed conflict, disruption of a strait or canal, port closure, political instability, sanctions, military tension or another geopolitical event affects international transportation.

When geopolitical risk escalates, a shipping line or airline may reroute cargo, change ports of call, tranship cargo, suspend carriage or discharge at an alternative port. Such changes may affect not only transit time but also War Risk Surcharge, Emergency Surcharge, additional freight, Storage, Demurrage, Detention, onward carriage and other costs.

Marine Cargo Insurance requires separate analysis of ordinary cargo risks, war risks, strikes and terrorism-related risks, and pure delay. The fact that insurance is described commercially as “All Risks” does not mean that every war-related or delay-related economic loss is covered.

In this article, shipper means the party acting as Shipper in the pre-shipment stage, including Booking and shipment instructions, while cargo owner refers to the party holding the economic interest in the cargo or making decisions concerning insurance, additional costs or disposition of the cargo. The shipper and cargo owner may be the same party, but they may differ depending on the transaction structure, B/L particulars, sale terms and other circumstances.

This article is not intended as a news article concerning any particular conflict. It provides a practical framework for shippers, cargo owners, freight forwarders, NVOCCs and insurance practitioners to determine what should be checked and in what order when geopolitical risk affects a shipment.

Scope of This Article

Item Covered in This Article Covered in Other Articles
Initial response Sequence for checking cargo location, operations, contract, insurance and cost Current military situation in a particular region
Marine Cargo Insurance Separation of ordinary cargo, war, strikes and delay risks Detailed commentary on every provision of ICC(A)/(B)/(C)
War risk Practical review of Institute War Clauses (Cargo) Final coverage determination under an individual policy
Additional charges Review of Surcharge, Storage, Demurrage and cost pass-through General calculation of individual charges
Rerouting Relationship with B/L terms, carriage terms and insurance Final legal interpretation of a particular B/L clause
Force Majeure Practical review of trigger, notice, mitigation and cost Final legal effect under the individual contract
Sanctions Initial review of cargo, parties, vessel, banks and insurance Current sanctions lists and individual legal determination
Stranded or abandoned cargo Storage, return, disposal and mitigation Compulsory disposal and lien rules under local law
Freight forwarder liability Standard Five Classifications and Contracting Carrier analysis Final determination of liability for an individual claim

Basic Sequence When Geopolitical Risk Arises

  1. Identify all shipments potentially affected.
  2. Determine whether each shipment is unshipped, delivered to port, loaded, at sea, transhipping, or already at destination.
  3. Obtain formal operational information from the shipping line, airline or overseas agent.
  4. Confirm the planned route, actual route, ports of call, transhipment ports and destination.
  5. Review the sale contract, Incoterms, quotation, carriage contract, House B/L and Master B/L.
  6. Review contractual provisions concerning dangerous routes, termination, alternative ports and additional costs.
  7. Review the underlying Marine Cargo Insurance.
  8. Review Institute War Clauses, Institute Strikes Clauses and other endorsements.
  9. Check for any Notice of Cancellation, territorial restriction or additional premium notice from insurers.
  10. Identify War Risk Surcharge, Storage, Demurrage and other additional expenditure.
  11. Review whether sanctions or embargoes may restrict carriage, payment or insurance services.
  12. For unshipped cargo, explain operational change, timing, insurance and cost to the shipper; after shipment or where the economic decision lies elsewhere, provide the relevant information to the cargo owner.
  13. Where alternatives exist, compare cost, time and insurance conditions.
  14. Record approval for additional arrangements where required.
  15. Obtain specialist legal advice where material legal issues remain.

Separate the Insurance by Type of Risk

Risk Category Representative Insurance Terms Typical Subject Main Caution Party to Consult
Ordinary cargo risks Institute Cargo Clauses (A)/(B)/(C) Physical loss or damage insured under the applicable clauses Scope differs among the clauses Policy, insurer and insurance intermediary
War risks Institute War Clauses (Cargo) War, civil war, hostile acts, certain capture or seizure, mines and similar perils Separate from ordinary ICC cover and subject to a distinctive duration structure Insurer and insurance intermediary
Strikes and terrorism-related risks Institute Strikes Clauses (Cargo) Strikers, riots, civil commotions and specified terrorism or politically motivated acts Review separately from war cover Insurer and insurance intermediary
Pure delay Ordinarily a separate issue from Cargo Cover Late delivery and loss of sales opportunity Separate physical cargo loss from economic delay loss Insurer and sale-contract function
Freight forwarder liability Freight Forwarder's Liability Insurance The freight forwarder's own contractual or legal liability Not the cargo owner's first-party Marine Cargo Insurance Liability insurer
P&I P&I Cover Shipowner and other third-party liabilities Do not confuse P&I with first-party cargo insurance P&I Club or relevant insurer

ICC(A) Does Not Remove the Need to Review War, Strikes and Delay

Institute Cargo Clauses (A) 1/1/09 provide broad cargo cover, but they do not provide unrestricted insurance for every form of economic loss.

The clauses contain separate exclusions dealing with Delay, War and Strikes-related risks.

It is therefore insufficient merely to confirm that “ICC(A)” appears on the policy.

The review should include:

  • the Institute Cargo Clauses version and form;
  • whether Institute War Clauses (Cargo) or equivalent war cover applies;
  • whether Institute Strikes Clauses (Cargo) or equivalent cover applies;
  • the duration of each cover;
  • conditions applying to rerouting, intermediate ports and substituted ports;
  • any Notice of Cancellation clause;
  • additional premium or revised terms; and
  • sanctions clauses or other restrictions on performance.

Duration under Institute War Clauses (Cargo)

Institute War Clauses (Cargo) 1/1/09 do not use exactly the same duration structure as ordinary cargo insurance.

For ordinary sea carriage, war cover generally attaches when the insured cargo is loaded on an oversea vessel and terminates when it is discharged from the vessel at the final port or place of discharge, or when the applicable time limit after the vessel's arrival expires, subject to the detailed provisions of the clauses.

Intermediate discharge, a port of refuge, a substituted port, termination of the voyage, reshipment and deviation may require notice to insurers, additional premium or satisfaction of conditions for continuation or reattachment of cover.

Accordingly, the fact that an underlying Cargo Policy operates on a warehouse-to-warehouse basis does not establish that war cover necessarily operates for exactly the same period.

War Cancellation and Revised Terms

A Marine Cargo Insurance contract may incorporate a provision allowing notice of cancellation of war cover.

For example, where an Institute War Cancellation Clause (Cargo) applies, war cover may be cancelled subject to the notice mechanism provided by that clause.

However, not every policy adopts the same cancellation period or contractual structure.

The practical review should establish:

  • which Cancellation Clause is incorporated;
  • who issued the notice and when;
  • when the notice becomes effective;
  • the treatment of shipments for which war cover has already attached;
  • the treatment of unshipped cargo;
  • the revised terms or additional premium offered; and
  • the deadline for accepting any revised terms.

It is therefore equally unsafe to assume either that “all war cover automatically disappears once war begins” or that “an annual policy can never change until its annual expiry date.”

Separate Delay Loss from Physical Cargo Damage

Loss Example Basic Marine Cargo Insurance Analysis Practical Review
Pure late arrival Arrival 14 days later than planned Review the Delay exclusion Also review sale and carriage contracts
Lost sales opportunity Seasonal sales period missed Different from ordinary physical cargo damage Review contractual loss provisions
Contractual penalty Late-delivery penalty Not automatically covered under a Cargo Policy Review sale contract and liability insurance
Factory shutdown Production stops because components are late Separate from damage to the cargo itself Review consequential-loss exposure
Deterioration during delay Perishable or temperature-controlled cargo deteriorates Physical damage does not itself establish coverage; cause and exclusions must be reviewed Review delay cause, temperature records and policy terms
Physical damage in transit Cargo directly damaged by a war peril Determine whether the cause is an insured peril Review War Clauses and other endorsements

Rerouting, Alternative Ports and the Contract of Carriage

A shipping line or Actual Carrier may change the intended route where war, conflict or another serious danger makes the original route unsafe or impracticable.

A B/L or carriage terms may contain provisions dealing with dangerous routes, deviation, alternative ports, transhipment, discharge and termination of carriage.

A difference from the original Schedule therefore does not, by itself, determine that the Carrier has breached the contract.

The review should include:

  • both House B/L and Master B/L;
  • the Carrier's contractual liberty in dangerous circumstances;
  • Deviation or Route Liberty provisions;
  • rights to discharge at an alternative port;
  • conditions for termination of carriage;
  • allocation of additional expenditure;
  • notice to the shipper or cargo owner, as applicable; and
  • whether the change requires notice to the insurer.

Force Majeure Is Not Automatic Immunity

Force Majeure clauses are commonly used to address events such as war, conflict, government action, port closure and strikes.

However, “war occurred, therefore all obligations and costs disappear” is not a general rule.

The effect depends on the wording of the contract, governing law, the actual interference with performance, causation and other relevant circumstances.

Review Item What to Confirm Risk if Missed Response
Specified event Whether war, sanctions or port closure falls within the clause Relying on an event outside the clause Review the wording
Effect on performance Whether performance is genuinely prevented or affected Confusing increased cost with impossibility Document the actual effect
Notice period When and to whom notice must be given Failure to satisfy notice requirements Give written notice in time
Mitigation Whether alternatives should be investigated Avoidable loss may increase Document alternatives
Additional costs Who bears them Confusing exemption from performance with cost allocation Review separately
Termination Whether prolonged events permit termination Incorrect termination timing Obtain legal advice

Additional Charges and Passing Costs to the Customer

Geopolitical disruption may give rise to:

  • War Risk Surcharge;
  • Emergency Surcharge;
  • additional freight arising from diversion;
  • transhipment costs;
  • additional Storage;
  • Demurrage;
  • Detention;
  • inland transport from an alternative port;
  • rebooking or redelivery; and
  • return or forwarding costs.

The fact that a shipping line or another third party has charged the freight forwarder does not automatically establish that the same amount can be passed to the cargo owner.

The quotation, actual-cost provisions, Surcharge clauses, Standard Trading Conditions, additional instructions and prior communication should be reviewed.

Where additional expenditure is accumulating, the freight forwarder should not necessarily wait until the final amount is known. The cargo owner should be advised of the estimated amount or charging basis early, together with any available alternatives.

Sanctions and Embargoes

Geopolitical disruption requires separate analysis of physical transportation risk and legal sanctions or embargoes.

The review may extend beyond the cargo itself to the Shipper, Consignee, ultimate end-user, vessel, shipowner, banks, insurers and other transaction participants.

The sanctions regime legally applicable to a transaction depends on the structure and relevant jurisdictional connections. A Japanese company should review applicable Japanese measures under the Foreign Exchange and Foreign Trade Act, while the involvement of foreign banks, insurers, shipping lines or other service providers may also lead to restrictions under the laws applicable to those entities.

Accordingly, none of the following assumptions is sufficient: “the cargo itself is legal, so there is no sanctions issue”; “the destination country is not sanctioned, so there is no issue”; or “a listing under a foreign sanctions regime automatically makes the transaction unlawful in Japan.”

Where there is a material sanctions concern, shipment, payment, insurance or another relevant step should be held pending review by the appropriate legal or compliance function.

Stranded and Abandoned Cargo

Port closure, customs suspension, sanctions or refusal by the Consignee may leave cargo stranded at destination or at a transhipment location.

Storage, Demurrage, Detention, reefer electricity, warehouse charges and other costs may then increase simply with the passage of time.

Responsibility does not therefore need to be finally determined before mitigation begins.

The following should be established promptly:

  • the exact cargo location;
  • the party in possession of the cargo;
  • the end of Free Time;
  • daily or weekly additional cost;
  • whether the Consignee can take delivery;
  • whether destination or Consignee can be changed;
  • whether return is possible;
  • whether the cargo can be moved to another storage facility;
  • local procedures for cargo disposal;
  • whether insurers should be notified; and
  • written instructions from the cargo owner.

Lien Requires Review of Contract, Governing Law and Local Law

Where freight, Storage or other charges remain unpaid, a freight forwarder, NVOCC or Carrier may consider asserting a lien over cargo.

Whether a lien can be exercised, the debts it may secure, and whether the goods may ultimately be sold or disposed of depend on the contract, Standard Trading Conditions, governing law and the law where the cargo is located.

For cargo stranded overseas, Japanese lien principles should not simply be assumed to apply.

Because continued detention may itself generate further cost or loss, substantial cases should be reviewed by a maritime lawyer and, where necessary, local counsel before enforcement action is taken.

Scope of Freight Forwarder Involvement and the Standard Five Classifications

These Standard Five Classifications are not legal classifications established by statute or universally accepted by the industry. They are an analytical framework used in this series to organize the scope of a freight forwarder's contractual and operational involvement.

Classification Main Involvement during Geopolitical Disruption Review of Operational Change and Additional Cost Liability Caution
Simple Intermediary Communication and arrangement with the shipping line and other providers Separate third-party costs from the intermediary's own Fee Intermediary status does not automatically eliminate liability
Cargo Transportation Service Provider Management of the transportation period undertaken Review subcontractor changes and additional expenditure Identify the scope actually contracted
NVOCC / House B/L Issuer Carriage contracted under the House B/L Explain Master B/L operational changes to the cargo owner Separate liability to the cargo owner from recovery against the Actual Carrier
Door-to-Door Single Contractor Integrated management through final delivery Redesign route, alternative port and inland carriage Broad involvement does not mean every exceptional cost is automatically absorbed
Agent / Coordinator for Specific Operations Coordination of particular Booking, insurance, customs or other operations Act within the specific mandate Do not extend responsibility beyond the agreed work

Contracting Carrier and Actual Carrier describe legal and contractual status and do not replace the Standard Five Classifications.

Nor does classification as an NVOCC / House B/L Issuer automatically establish identical legal responsibility in every case. Contracting Carrier status must be analysed from the House B/L, contract, governing law and other relevant circumstances.

Storage, transhipment, inspection, handling, return arrangements and other physical or peripheral operations do not constitute an independent sixth classification merely because those activities are performed.

Distinguishing the Contracting Carrier from the Actual Carrier

Item Contracting Carrier Actual Carrier Review during Geopolitical Disruption
Contract with cargo owner May contract through a House B/L May have no direct contract with the cargo owner Identify the contractual communication point
Physical operation May not operate a vessel Operates the actual transport Identify who decided to reroute
Notice of rerouting May be contractual interface with the cargo owner Issues Master B/L-level operational information Determine whether merely forwarding the upstream notice is sufficient
Additional charges Must establish basis for charging the cargo owner May charge under Master B/L or Tariff Separate upstream charge from downstream pass-through
Cargo damage May face a claim from the cargo owner May be the operational party involved in the casualty Separate downstream liability from upstream recovery

Cases Commonly Problematic in Practice

Case Main Cause Documents to Review Decision Point Initial Response
Rerouting around dangerous waters Safety diversion Operational notice, B/L and terms Carrier liberty and additional costs Notify cargo owner of delay, cost and insurance implications
No War Cover Insurance review failure Policy, Certificate and Endorsement Whether loss falls within a War exclusion Notify insurer immediately
War Risk Surcharge disputed Insufficient prior explanation Quotation, terms and Carrier Invoice Contractual basis for pass-through Compare upstream cost with downstream contract
Destination port closes Conflict or government action Operational notice and B/L Alternative port and termination terms Confirm cargo location and alternatives
Long-term cargo detention Customs suspension or refusal of delivery Agent reports and Storage invoices Escalating costs and disposal options Obtain written cargo-owner instructions
Possible sanctions issue Concern regarding party, bank or transaction Screening and payment records Applicable sanctions regimes Hold shipment and payment pending review
Notice of Cancellation War-risk terms revised after escalation Insurer notice and Policy Treatment of attached and unshipped risks Identify affected shipments with the insurance intermediary
Force Majeure invoked Performance materially affected Contract, notice and operational evidence Contractual trigger Obtain legal review before the notice deadline

Application Scenario 1: Rerouting of a Yokohama–Rotterdam Shipment

The following are hypothetical examples used to illustrate the decision process.

Machinery parts worth JPY 42 million are shipped from Yokohama to Rotterdam in one 40ft Container. After loading, security conditions on the planned route deteriorate and the shipping line decides to make a substantial diversion.

The original Transit Time is approximately 30 days, but the revised route is expected to take approximately 46 days. The shipping line charges an additional Surcharge of JPY 110,000. Rebooking inland delivery in Rotterdam adds a further JPY 85,000.

The cargo owner argues that it accepted a freight quotation of JPY 560,000 and that the freight forwarder should therefore absorb the additional JPY 195,000.

The freight forwarder responds that its quotation stated that new Carrier-imposed Surcharges introduced after quotation would be charged separately at actual cost.

The analysis begins by confirming that the shipping line actually imposed the charges. It then reviews the quotation validity, Surcharge wording, timing of the operational notice, timing of notice to the cargo owner and whether any reasonable alternative was available.

The fact that an upstream cost was incurred and the question whether it can be passed downstream to the cargo owner must be analysed separately.

Application Scenario 2: ICC(A) without Confirmed War Cover

Industrial machinery worth JPY 68 million is exported from Nagoya to the Middle East. The exporter understands that the cargo is insured on an “All Risks” basis.

During sea transit, an event potentially falling within a war peril causes physical damage estimated at JPY 12 million.

After the casualty, the Policy is reviewed. Institute Cargo Clauses (A) 1/1/09 are shown, but there is no confirmed Institute War Clauses (Cargo) endorsement.

The cargo owner argues that because JPY 68 million was insured on an “All Risks” basis, war-related physical damage must also be insured.

ICC(A), however, contains a War exclusion.

The actual determination requires review of the cause, applicable clauses, whether separate War Cover existed, whether that cover was in force at the time and location of loss, the voyage and all other relevant Endorsements.

The commercial description “All Risks” should therefore never be used as a substitute for reading the actual insurance terms.

Application Scenario 3: JPY 500,000 per Month of Storage at a Transhipment Port

General merchandise worth JPY 38 million is shipped from Osaka to an overseas destination. Political instability causes the cargo to be stopped at a transhipment port, and the Consignee refuses to take delivery.

Storage and related charges are increasing at approximately JPY 500,000 per month.

The cargo owner argues that because the NVOCC contracted to carry the cargo to destination, the NVOCC should store it free of charge until delivery becomes possible.

The NVOCC responds that the Master B/L contains provisions dealing with termination of carriage, alternative discharge and additional costs where dangerous circumstances arise.

The first task is to establish the cargo's exact location, possession, daily cost and physical condition.

The House B/L and Master B/L should then be reviewed separately, together with communication to the cargo owner and possible return, forwarding to another port or transfer to alternative storage.

If a contractual lien or other right of retention is considered, it should not be enforced without reviewing the law at the place where the cargo is located and the relevant contractual basis.

Application Scenario 4: Sanctions Concern after Booking

A Japanese exporter books transportation for industrial components worth JPY 22 million to a third country. After Booking, an overseas bank raises a sanctions-screening enquiry concerning a person connected with the Consignee.

The shipper argues that the destination itself is not subject to sanctions and the goods are ordinary commercial products, so shipment should proceed.

The bank, however, places payment on hold, while the insurer also delays issuance of the insurance Certificate pending further review.

The review must distinguish whether a particular foreign sanctions regime applies directly to the Japanese exporter from whether Japanese measures under the Foreign Exchange and Foreign Trade Act apply, and from whether foreign banks, insurers or other service providers are legally prevented from participating.

Moving the cargo before the review is complete may convert a compliance issue into a larger problem involving payment, insurance, delivery and accumulating storage costs.

Common Misconceptions

Misconception Actual Practice Practical Caution
ICC(A) automatically covers war ICC(A) contains a War exclusion and separate War Cover must be reviewed Check Policy and Endorsements
War Cover follows the same warehouse-to-warehouse period as ordinary cargo cover Institute War Clauses have their own Transit Clause Review loading, discharge and applicable time limits
An annual policy means War Cover cannot change during the year A policy may contain Notice of Cancellation provisions Review current insurer notices
If the voyage is delayed, all delay loss is covered The Delay exclusion must be reviewed Separate physical loss from pure economic delay
Force Majeure automatically removes all liability and additional costs The result depends on wording, notice, governing law and other factors Separate performance relief from cost allocation
Every shipping-line Surcharge can automatically be passed to the cargo owner Upstream cost and downstream contractual recovery are separate questions Review quotation, terms and approval
An NVOCC need not explain rerouting because the shipping line made the decision The NVOCC may be the Contracting Carrier interface with the cargo owner Review the House B/L relationship
Sanctions review only requires checking the destination country Parties, banks, vessels, insurance and other connections may matter Review the transaction as a whole
Stranded cargo should simply remain in storage until responsibility is decided Costs and damage may increase with time Mitigation should proceed in parallel
A Japanese freight forwarder only needs to consider Japanese lien law Governing law and the law where the cargo is located may be critical Review local law for overseas cargo

Main Documents to Review

Document Main Review Purpose during Geopolitical Disruption Problem if Missing
Sale Contract / Incoterms Risk and cost allocation Determine commercial allocation between the sale parties Insurance and cost responsibility may be unclear
Quotation Surcharges, actual costs and validity Review additional cost pass-through Charging basis becomes unclear
House B/L Contractual relationship between the NVOCC and shipper or cargo owner Review Contracting Carrier rights and obligations Downstream contract cannot be analysed
Master B/L Contract with Actual Carrier Review upstream rerouting and additional-cost basis Shipping-line basis is unclear
Carrier Notice Rerouting, port change and Surcharge Establish reason and effective date Customer explanation lacks evidence
Marine Cargo Policy Clauses, sum insured and route Establish basic insurance Coverage basis is unclear
War / Strikes Endorsement Separate cover and conditions Determine war and strikes protection Coverage cannot be established
Cancellation Notice Effective date of change or cancellation Separate attached from unshipped risks A coverage gap may be missed
Sanctions Review Records Parties, vessel, payment and insurance Determine whether transaction can continue Transportation, payment or insurance may be interrupted
Customer Notice and Approval Explanation, alternatives and approval Evidence concerning operational and cost changes Later dispute that the customer was not informed

Decision Checklist

Situation Party to Consult Item to Confirm Action if a Problem Is Identified
Initial deterioration in security Shipping line and overseas agent Affected route, vessel and operation Identify all affected shipments
Unshipped cargo Shipper and insurance intermediary Alternative route, War Cover and additional cost Consider holding shipment
Loaded cargo Shipping line and NVOCC Current location, route and ETA Notify the cargo owner of changes
Rerouting Shipping line and insurer Deviation, substituted port and insurance continuation Give any required notice
War Cover review Insurer and insurance intermediary CL385 or equivalent, duration and Cancellation Confirm revised terms
Surcharge imposed Shipping line and cargo owner Amount, quotation and pass-through basis Record approval
Long-term detention Overseas agent and cargo owner Storage, Free Time and return alternatives Present mitigation options
Potential sanctions issue Legal, compliance and specialist adviser Applicable regime, parties, payment and insurance Hold the relevant transaction pending review
Consignee refuses delivery Cargo owner and overseas agent Return, resale, disposal and local law Obtain written instructions
Lien contemplated Maritime lawyer and local counsel Contract, governing law and local law Do not detain or dispose of cargo without review
Force Majeure notice Counterparty and maritime lawyer Trigger and notice period Respond in writing before the deadline
Cargo casualty Insurer, NVOCC and Actual Carrier Cause, insured peril and liability Run insurance and Carrier claims in parallel

How to Structure the Decision Process

Assume that increased military tension around a major route causes a shipping line to announce a diversion. The analysis should not begin with the question, “Who must pay the additional cost?”

First determine whether the cargo has already been loaded and obtain the formal operational notice from the Actual Carrier under the Master B/L.

Next review the House B/L and Master B/L provisions concerning dangerous routes and rerouting, and identify whether additional expenditure will actually arise.

At the same time, review Marine Cargo Insurance and ask the insurer whether the changed route affects War Cover or requires any notice.

The cargo owner should then be advised separately of the revised ETA, additional cost, insurance position and available alternatives.

Only after those facts are established should the quotation and customer approval be used to determine ultimate allocation of the additional expenditure.

Starting with a conclusion such as “war means all costs belong to the cargo owner” or “an NVOCC must absorb everything” mixes contract, insurance and cost questions that must instead be analysed separately.

When to Consult a Maritime Lawyer

  • Force Majeure is to be relied upon to suspend performance, terminate a contract or avoid liability
  • Dangerous-route, deviation or route-liberty provisions in a House B/L or Master B/L are disputed
  • The scope of an NVOCC's liability as Contracting Carrier is disputed
  • A cargo owner claims delay damages, contractual penalties or factory-shutdown loss
  • A lien or right of retention over cargo is contemplated
  • Sale, abandonment, destruction or other disposal of stranded cargo is contemplated
  • Sanctions or embargoes involve complex jurisdictional issues or several sanctions regimes
  • Substantial War Risk Surcharge or other additional expenditure is disputed
  • There is a material disagreement with the Marine Cargo Insurer concerning application of War Cover
  • Foreign ports, overseas agents or foreign Actual Carriers create issues of governing law or jurisdiction

Summary

Effective response to geopolitical risk in international logistics requires more than monitoring the news.

The basic sequence is cargo location → operational status → contract of carriage → Marine Cargo Insurance → additional costs → sanctions → communication with the shipper or cargo owner.

For insurance purposes, Institute Cargo Clauses, Institute War Clauses, Institute Strikes Clauses and the Delay exclusion should be analysed separately. In particular, War Cover does not necessarily operate for the same period as ordinary Cargo Cover.

For freight forwarders and NVOCCs, the Standard Five Classifications help identify contractual and operational involvement, while Contracting Carrier and Actual Carrier must be analysed separately where relevant.

For Surcharges and Storage, the fact that a third party incurred or invoiced a cost should also be distinguished from the separate question whether that cost can contractually be passed to the cargo owner.

Where sanctions, Force Majeure, prolonged detention or liens are involved, the matter should not be treated as a logistics issue alone. Insurers, legal and compliance functions, maritime lawyers and, where required, local advisers should be involved at an early stage.