Pallet Delivery of Imported Cargo

This page is a translation for reading support. The Japanese article is the official version. For legal, customs, insurance, or regulatory decisions, please confirm against the Japanese original and the relevant parties.

Delivery of Imported Cargo on Pallets

Delivery of imported cargo on pallets refers to the method of transporting goods, after obtaining the Import Permit, loaded on pallets from bonded areas, CFS, warehouses, or container yard peripheral facilities to the final delivery destination within Japan.

For items such as cartons, food raw materials, chemicals, machine parts, sundries, and building materials, instead of handling goods one box at a time, consolidating multiple goods on pallets can help shorten cargo handling time, stabilize the cargo, and streamline quantity management.

However, simply specifying "deliver on pallets" does not finalize the actual delivery conditions. Tasks such as unloading pallets from the vehicle, moving them inside the building, breaking down pallets to handle individual items, and collecting empty pallets are all separate operations.

If even one condition such as the absence of a forklift at the delivery site, pallets not fitting into the entrance, vehicle inability to enter the premises, or no space to place pallets remains unresolved, waiting, unloading failure, return to sender, redelivery, manual handling, or transfer to another vehicle may become necessary.

Therefore, in pallet delivery of imported cargo, it is necessary to confirm as an integrated whole—not only the cargo packing condition but also the vehicle, unloading equipment, delivery route, scope of work, receipt method, and pallet handling method before arranging delivery.

Scope Covered in This Article

Item Contents in This Article Contents Covered in Other Articles
Meaning of Pallet Delivery Basic concept when delivering imports with cargo loaded on pallets to domestic delivery destinations General arrangement of imported cargo delivery is covered under Domestic Delivery Arrangements for Imported Cargo
Cargo Information Pallet dimensions, quantity, height, total weight, uneven load, and presence of cargo shifting Description, quantity, price, and other import declaration details are handled in Customs Documents & Pre-Declaration Checks
Delivery Site Equipment Confirmation of forklift, hand pallet truck, cargo handling area, entrances, and storage locations Details when a forklift is not arranged are covered in Non-Provision of Forklift at Imported Cargo Delivery
Unloading Methods Differences between delivery on vehicle, unloading, power gate, crane, and manual unloading Details on manual handling difficulty are covered in Manual Unloading Prohibited at Imported Cargo Delivery
Delivery Reservation / Time Specification Pallet delivery conditions and their relation to reservation slots, reception time, and handling time Reservation methods are covered in Delivery Reservations for Imported Cargo, and time management in Time-Specific Delivery for Imported Cargo
Vehicle Conditions Compatibility of pallet loading methods with flatbed trucks, box trucks, wing trucks, power gate trucks, and other vehicles Vehicle access dimension limits are covered in Vehicle Restrictions in Imported Cargo Delivery
Additional Charges Handling, waiting, return-to-sender, redelivery, transshipment, storage, and pallet collection charges Calculation and billing conditions for Waiting Charges are handled in Waiting Charges Occurring in Domestic Delivery of Imported Cargo
Non-Delivery Initial response and alternative arrangements when pallet delivery is impossible Handling after return to sender is covered in Non-Delivery and Return of Imported Cargo
Wooden Pallets Clarification to avoid confusing ISPM15 with domestic delivery conditions, ownership, and collection obligations Details of plant quarantine regulations are discussed in articles concerning Wood Packaging Materials and ISPM15
Cargo Incidents Preservation of evidence if cargo tilts, falls, or is contacted by a forklift during unloading Details on cargo insurance and claims are covered in Cargo Insurance and Claims Procedures

Pallet Delivery and Related Operations Are Not the Same

The most important point in pallet delivery is to clearly define the scope of work included in the delivery contract.

Expressions such as "pallet delivery," "doorstep delivery," "delivery on vehicle," "including unloading," and "delivery to designated location" may be used differently depending on the business partner, delivery company, and region. Do not judge by terminology alone; confirm how far the work actually extends.

Operation Category Main Tasks Usually Confirmed by Items to Check in Quotation / Arrangement Problems From Insufficient Confirmation
Pallet Delivery Transport cargo loaded on pallets to the delivery destination Freight forwarder, delivery company Pallet dimensions, weight, quantity, and vehicle type Unable to load, vehicle change, split delivery
Delivery on Vehicle The vehicle arrives at the delivery site and cargo is handed over on the vehicle Delivery company, cargo owner Who will perform the unloading Cargo owner mistakenly assumes unloading is included
Unloading Unload cargo from the vehicle onto the ground or handling area Cargo owner, cargo handler, delivery company Availability of forklift, power gate, crane, and other equipment Unloading failure, waiting, return to sender
In-house Delivery Move cargo inside the building to the specified location after unloading Cargo owner, delivery personnel Passage width, steps, floor load capacity, elevator, and protection measures Delivery halted at entrance, need for additional workers
Manual Unloading Break down pallets and unload cartons one by one Cargo handlers, workers Number of items, unit weight, number of workers, working hours, and safety Cannot perform the work on the same day, increased labor costs
Unpacking and Installation Remove outer packaging and set up machinery or products at the designated location Specialized movers, installers Work scope, tools, waste disposal, and technical requirements Cannot be handled as ordinary delivery
Pallet Collection Collect empty pallets after delivery Delivery company, pallet owner Ownership, collection date, storage location, and collection charges Forgotten collection, loss, additional collection charges

Transporting cargo to the delivery address and moving it inside the building to a designated location are not the same. The point at which standard delivery operations end should be confirmed through the quotation, delivery instructions, work orders, delivery company’s conditions, and mutual agreement.

Cargo Information to Confirm Before Arranging Delivery

Merely stating "pallet cargo" is insufficient to select appropriate vehicles and handling methods. Delivery companies need specific information that represents the actual loading condition.

Item to Confirm Details to Confirm Situations Where Used for Judgment Points of Caution
Number of Pallets Total number and whether stacking is possible Vehicle size, loading arrangement, unloading time Do not confuse the number of cargo pieces with the number of pallets
External Dimensions Width, depth, and total height including cargo Truck bed, doors, entrances, elevators, and racks Include cargo overhang beyond the pallet base
Weight Weight per pallet and total weight Load capacity, handling equipment capacity, and floor load Check the heaviest pallet, not the average weight
Load Condition Uneven load, center of gravity, base strength, and risk of cargo shifting Fork insertion, transfer, and safe handling Even if within weight limits, an uneven load may prevent safe handling
Packing Condition Stretch film, bands, corner protectors, and top protection Stability during movement, rain protection, and handling protection Cargo shifting inside may occur even if the exterior appears secure
Stackability Whether stacking is possible and whether the cargo can tolerate stacking load Loading efficiency in the vehicle and temporary storage Do not stack cargo that is not intended for stacking
Fork Insertion Direction Two-way or four-way entry and the condition of fork entry points Unloading location and equipment used Fork insertion may be impossible from some vehicle orientations
Hazardous / Special Cargo Hazardous materials, temperature-controlled goods, fragile items, long cargo, and heavy cargo Vehicle, handling methods, temporary placement, and incident response Do not apply general cargo handling methods without confirming suitability

Even if pallet quantities are listed on an overseas Packing List, the actual cargo configuration during domestic delivery may differ. When transshipment, inspection, sorting, or repacking is conducted at a CFS or warehouse, verify the actual measurements at the time of release.

Receiving Conditions to Confirm at the Delivery Destination

Item to Confirm Specific Details to Check Contact at Delivery Site Alternative Plans if Conditions Are Not Met
Unloading Equipment Availability of forklift, hand pallet truck, crane, dock leveler, and other equipment Person in charge at the delivery site Arrange a power gate truck, crane truck, or cargo handling company
Equipment Capacity Maximum load, fork length, lift height, and available operating time Person in charge of delivery site equipment Change to equipment with suitable capacity
Delivery Entrance Width, height, steps, shutter, and eave position Delivery site facility staff Consider transloading to smaller pallets or manual unloading
Delivery Route Passageways, corners, slopes, floor surface, and elevators Delivery site facility staff Add specialized movers or floor protection
Storage Space Area available for pallets, floor load, indoor or outdoor location, and temporary storage allowance Delivery site warehouse staff Consider split delivery, an alternative warehouse, or delivery of only the quantity needed that day
Reception Conditions Reservation number, reception hours, gate-in procedures, and required documents Reception desk at the delivery site Obtain a new delivery reservation
Vehicle Conditions Vehicle height, width, length, gross weight, wing opening, and prohibition of roadside parking Delivery site, facility manager Change to a smaller vehicle or split the delivery
Receipt Authority Who confirms the quantity and packing condition and signs the receipt Person in charge at the delivery site Coordinate with the authorized person’s available time
Pallet Handling Leaving pallets, immediate return, later collection, disposal, or reuse Cargo owner, delivery site Separately arrange the collection vehicle, storage, and charges

Pallet Delivery Decision Flow

  1. Verify the actual cargo configuration for goods to be released after the Import Permit.
  2. Confirm the external dimensions, weight, number of pallets, height, and stackability of each pallet.
  3. Check for pallet damage, cargo shifting, cargo overhang, and uneven load.
  4. Confirm that the delivery site accepts cargo on a pallet basis.
  5. Verify the type and capacity of unloading equipment.
  6. Confirm that the vehicle can enter the delivery site and perform handling at the designated location.
  7. Separate the scope of work for delivery on vehicle, unloading, in-house delivery, and unpacking.
  8. Decide whether pallets will be left behind, collected immediately, or collected later.
  9. Explain conditions not included in standard charges, such as handling, waiting, and return to sender.
  10. Record the delivery reservation, contact person, phone number, reception number, and receipt method.
  11. If conditions are incomplete, do not arrange the vehicle until they are confirmed.
  12. After delivery, retain the POD, receipt signatures, photos, and records of abnormalities.

Common Issues in Practice

Case Main Cause Reference Documents Key Points for Decision Initial Action
No forklift available at the delivery location Failure to confirm who is responsible for unloading Quotation, delivery instructions, delivery location confirmation emails Whether delivery is vehicle-to-door or includes unloading and whether alternative equipment can be arranged Do not forcibly attempt manual unloading; decide whether to wait or return the cargo
Forklift capacity is insufficient Incorrect pallet weight or center-of-gravity information Packing List, weight chart, warehouse measurement records Check not only maximum load but also whether the center of gravity and fork length are suitable Arrange adequate equipment or a specialist service provider
Pallet does not fit through the receiving entrance Failure to confirm the actual external dimensions including the cargo Measurement photos, entrance dimensions, facility drawings Whether safe transshipment or manual unloading can be performed on-site Avoid leaving pallets outdoors; return the cargo or arrange redelivery
Assumed a power gate truck would handle unloading Failure to confirm equipment for moving pallets on the ground or floor surface conditions Vehicle specifications, site photos, cargo handling conditions Whether the pallet can be safely moved after unloading from the gate Add a hand pallet truck or cargo handlers as needed
Delivery site requests individual cargo delivery Failure to agree on pallet delivery or individual cargo delivery Order terms, delivery requests, quotation terms Whether breaking down the pallet is within the contract scope and can be safely performed Obtain approval for additional work before proceeding
Vehicle cannot enter the premises Failure to confirm height, length, weight, or entry route restrictions Facility guides, vehicle restriction tables, site maps Whether transfer to a smaller vehicle or use of an alternative entrance is possible Wait at a safe location and do not force entry
Pallet cannot be left on-site No storage space at the delivery location and collection conditions were not confirmed Pallet terms, delivery site responses, collection contract Whether immediate collection is possible or cargo can be removed from the pallet Do not leave pallets unattended based solely on an on-site judgment
Rental pallet is not returned Lack of shared understanding regarding ownership and return obligations Rental contract, management numbers, receipt records Who is contractually responsible for returning it, when, and where Confirm its location and arrange collection or return
Pallet is damaged during unloading Degraded bottom board, uneven load, or improper fork insertion Dispatch photos, unloading videos, POD, incident reports Timing of the incident, responsible party, and presence of pre-existing damage Stop work, stabilize the cargo, and preserve evidence
Waiting time exceeds the reserved schedule Reception congestion, unavailable staff, or insufficient handling space Arrival records, reception logs, operation reports, call records Whether free waiting time and additional charge conditions were agreed Record the elapsed time and notify relevant parties promptly

Differences by Delivery Destination Type

Delivery Destination Typical Equipment to Confirm Common Issues Appropriate Confirmation Method
Distribution Center Loading berth, forklift, dock leveler Reservation slots, specified pallets, inspection methods Obtain the delivery manual for the center
Factory Handling yard, forklift, crane Differences between the main factory and delivery building and on-site rules Confirm with the actual receiving department
Retail Store Back room, hand cart, delivery entrance No pallet storage and delivery restrictions during business hours Confirm the delivery time and location with the store manager
Office Elevator, corridors, hand carts No forklift, stairs, and protective covering requirements Confirm conditions with the building management company as necessary
Construction Site Heavy machinery, delivery gate, temporary storage area Schedule changes, site safety education, and absence of the site supervisor Confirm site delivery procedures and the on-site contact for the delivery day
Exhibition Venue Loading dock, cargo handlers, time slots Designated contractors, internal drayage, and removal times Confirm delivery rules with the organizer or venue
Private Home / Residential Area Generally no large cargo handling equipment Vehicle access, road width, manual unloading, and safety Confirm site photos and the vehicle stopping location

Items to Specify in Quotations and Delivery Instructions

To prevent additional charges for pallet deliveries, it is necessary to specify not only the price but also the terms and conditions on which that price is based.

  • Number, external dimensions, weight, and stacking conditions of pallets
  • Type of vehicle used
  • Whether delivery is vehicle-to-door, includes unloading, or involves delivery to a designated location
  • Whether the delivery location provides unloading equipment or the delivery side arranges it
  • Whether manual unloading, unpacking, and installation are included
  • Whether delivery reservations and time appointments are included
  • Free waiting time and conditions under which Waiting Charges apply
  • Conditions and costs for cargo return, storage, or redelivery if delivery cannot be completed
  • Whether pallets are left behind or collected
  • That the arrangement is based on information provided by the customer or delivery location

For example, recording "Pallet delivery; delivery-site forklift to be used; unloading from the vehicle to be handled by the delivery site; in-house delivery and manual unloading are not included" can clarify the delivery scope.

However, merely including template language is insufficient if it does not match the actual request or operational reality. Quotation terms, emails, work instructions, and actual operations must be consistent.

Additional Charges and Responsibility Allocation

When additional charges arise, it is not appropriate to decide automatically that "the customer bears the costs because the delivery location caused the problem" or "the delivery company bears the costs because it failed to respond."

Cost allocation should be decided after reviewing the contract, quotation terms, information provided, scope of confirmation obligations, actual instructions, causes of the costs, and measures taken to prevent further damage.

Cost Item Main Occurrence Situations Required Records Main Points for Responsibility Assessment
Waiting Charges Waiting at reception, during unloading, or for staff or equipment preparation Arrival time, work start and end times, operation reports Free waiting time, prior notification, cause of waiting, and approval status
Return Cargo Charges When cargo is returned because unloading or receipt is not possible On-site photos, reason for refusal, communication history How and from whom the receiving conditions were communicated
Redelivery Charges When equipment, reservation, or vehicle is changed for redelivery Redelivery instructions, revised quotation, dispatch records Cause of redelivery and person approving the additional arrangements
Manual Unloading Charges When pallets are broken down and cargo is unloaded individually Number of workers, work hours, on-site instructions Whether the work was originally included in the contract and can be safely performed
Transshipment Charges When transferring cargo to a smaller vehicle or different pallets Transshipment details, work photos, additional instructions Whether vehicle restrictions or pallet standards were shared in advance
Storage Charges When cargo is stored in a warehouse until redelivery In-and-out records, storage days, rate tables Storage start time, timing of redelivery instructions, and cause of delay
Pallet Collection Charges When empty pallets are collected separately after delivery Management numbers, collection instructions, collection completion records Whether collection obligations and costs were agreed beforehand
Disposal Charges When disposing of unnecessary or damaged pallets Owner consent, disposal records, processing details Authority for disposal, ownership, and appropriateness of the disposal method

Additional charges generally represent actual costs incurred for extra vehicles, labor, time, storage, or rearrangements rather than penalties. It is important to separate and explain the cost items, quantities, durations, unit prices, and reasons.

Comparison of Freight Forwarder Involvement by Standard Five Classifications

The five classifications used in this article are not established by law or industry-wide consensus. They serve as an analytical framework within this series to clarify the scope of freight forwarder involvement.

Standard Five Classifications Main Involvement in Pallet Delivery Contracts / Documents to Confirm Notes on Responsibility Assessment
Simple Intermediary Introduces transport companies and supports booking communication or information transmission Scope of intermediary work, emails, quotation terms Distinguish whether the freight forwarder has contracted for domestic transport or merely arranged an introduction
Cargo Transportation Service Provider Provides domestic delivery using Actual Carriers Transport service agreement, carrier’s terms and conditions, delivery instructions Verify the contractual transport scope agreed with the cargo owner and the scope of subcontracted work
NVOCC / House B/L Issuer Coordinates domestic delivery as part of an ocean or multimodal transport contract House B/L, transport terms and conditions, quotation Confirm whether the House B/L transport scope includes domestic delivery to the cargo owner
Door-to-Door Single Contractor Provides integrated transport services including delivery after import customs clearance Through transport contract, quotation terms, subcontracting records Door-to-Door transport does not necessarily include unloading, in-house delivery, or unpacking
Agent / Coordinator for Specific Operations Individually coordinates delivery reservations, vehicle changes, handling equipment, or pallet collection Delegation details, work instructions, approval records Does not automatically guarantee the overall delivery or cargo condition unless such responsibility was explicitly assigned

Contracting Carrier and Actual Carrier are legal or contractual status concepts and do not replace the standard five classifications used in this article.

Unloading, manual unloading, in-house delivery, storage, inspection, repacking, and pallet collection do not by themselves constitute a sixth classification. Contractual status and the work actually delegated must be confirmed separately.

Example 1: No Forklift Available at a Small Office

Imported machine parts loaded on one pallet weighing several hundred kilograms were delivered to a small office. The customer had only explained that "delivery is possible because it is on the first floor."

On the delivery day, it was found that the office had no forklift or handling yard, making unloading from a standard box truck impossible. Being on the first floor does not mean that heavy cargo can be unloaded there.

In this case, manual unloading should not be forced. First, confirm whether the contract covers delivery on vehicle or unloading. Then decide whether a power gate truck with a hand pallet truck can be used or whether a crane truck or cargo handling company is necessary.

If delivery is not feasible that day, return, redelivery, and temporary storage will be required. Cost allocation should be reviewed by checking who assumed unloading was possible, the history of equipment confirmation, quotation terms, and explanations given to the customer.

Example 2: Forklift Available but Pallet Would Not Fit Through the Entrance

A factory delivery location had a forklift and confirmed that pallet delivery was possible, but the cargo protruded beyond the pallet edges and the actual external dimensions exceeded the entrance width.

Confirming forklift availability alone does not guarantee that the pallet can be moved inside. It is necessary to verify the maximum external dimensions, including the cargo, cushioning, and packing materials, rather than only the pallet dimensions.

If repacking or breaking down the pallet is required on-site, confirm the work area, worker safety, weather protection, cargo securing, and receipt method. Performing the work outdoors without preparation creates risks of falling cargo, quantity shortages, wetting, and packing damage.

If safe work is not possible, the cargo should be returned to a warehouse, transferred to smaller pallets, or redelivered as individual packages. Before redelivery, recheck the modified external dimensions and delivery route.

Example 3: Rental Pallet Return Conditions Were Not Shared

Imported cargo was delivered on rental pallets, but the delivery site understood that the pallets were being handed over permanently, while the delivery company expected immediate collection.

Immediate collection requires the delivery site to remove the cargo from the pallet immediately. Without workers or storage space, the vehicle must wait, potentially incurring Waiting Charges.

If collection is scheduled later, the management numbers, storage location, collection date, and treatment in the event of loss must be determined. Simply stating "pallet collection required" does not finalize the collection method.

The quotation or delivery instructions should specify whether pallets are left behind, collected immediately, or collected later, and should clarify the conditions under which rental, delay, or collection charges apply.

Wooden Pallets and ISPM15

ISPM15 is an international phytosanitary standard specifying treatment and marking requirements for untreated wood materials such as pallets, wooden crates, and dunnage moving in international trade to prevent the introduction and spread of pests.

However, the ISPM15 mark does not indicate the pallet owner, rental agreement, acceptance by the domestic delivery destination, collection obligation, or disposal authority.

For pallet delivery of imported cargo, confirm the following points separately:

  • Whether there were any issues with the treatment and marking of wooden packaging materials under plant quarantine requirements at the time of import
  • Whether the pallet can be left at the delivery destination
  • Who owns or manages the pallet
  • Who has authority to instruct collection, reuse, or disposal
  • Whether the pallet is a rental or managed pallet

If doubts arise regarding the treatment or marking during domestic delivery after the Import Permit, do not alter the marks on-site or dispose of the pallet without confirmation. Check the inspection status at import with the customs broker, warehouse, or relevant authorities.

Evidence to Retain at Delivery

Record Recorded Details Use Case Notes
Photos at Dispatch Overall pallet condition, packing, securing condition, and existing damage Classification of damage during transport or unloading Take both overall and detailed photos
Arrival Time On-site arrival, reception, cargo handling start, and cargo handling completion times Confirmation of waiting time and cause of delay Retain operation records in addition to the driver’s report
On-site Photos Vehicle position, delivery entrance, facilities, floor surface, and temporary storage area Explanation of unloading failure or vehicle restrictions Consider facility confidentiality and the photographing of people
Receipt Signature Recipient name, date and time, quantity, and reservations Confirmation of delivery completion and receipt authority Do not sign without reservations if abnormalities exist
POD Delivery date, delivery destination, quantity, cargo condition, and remarks Billing, claims, and delivery completion confirmation Do not assume the cargo condition was normal solely because the document was stamped or signed
Abnormality Records Damage, cargo collapse, shortage, refusal of receipt, and on-site instructions Investigation of incident causes and responsible section Record when the abnormality was discovered and the condition before and after work continued
Communication History Instructions exchanged with the customer, delivery destination, delivery company, and warehouse Confirmation of additional charges and scope of responsibility Confirm verbal instructions by email or another written method
Pallet Management Records Owner, management number, collection date, and collection completion Management of rental or recoverable pallets Store separately from cargo receipt records

If a Cargo Incident Occurs

During pallet delivery, incidents such as forklift contact, pallet bottom collapse, cargo collapse, falling from the vehicle, or rain exposure during outdoor temporary storage may occur.

If an incident occurs, stabilize the cargo before continuing work to prevent further damage, and record the incident location, personnel involved, equipment used, cargo condition, pallet condition, and on-site instructions.

Whether the incident is covered under marine cargo insurance depends on the insured transit, termination of insurance, cause of the incident, exclusions, and insured conditions. It cannot be assumed that an incident during domestic delivery or unloading is automatically covered or automatically excluded.

Cargo insurance and the liability of the freight forwarder or delivery company are separate systems. In cases involving high-value damage, disputes over the cause, bodily injury, or significant cost burdens, early consultation with the insurance agent, insurance company, and marine or transport law attorneys as needed is advisable.

Common Misunderstandings

Misunderstanding Actual Concept Practical Considerations
If it is pallet delivery, the delivery company will unload the goods Delivery and unloading are separate operations, and delivery may be completed by handing over the cargo on the vehicle Clearly specify who unloads the cargo and which equipment will be used
If there is a forklift, unloading can always be performed Capacity, fork length, insertion direction, load condition, and work location must all be compatible Confirm the equipment specifications, not only its availability
If the truck has a power gate, delivery can be made anywhere Floor condition, slopes, level differences, and moving equipment are also required after the pallet is lowered Check the route and method for moving the cargo after unloading
Providing the standard pallet size is sufficient Actual external dimensions, including cargo protrusions and packing, are required Use actual measurements taken at dispatch
Factories can always accept pallet deliveries Conditions differ by building, department, delivery entrance, and working hours, even within the same factory Confirm with the actual receiving personnel
Pallets become the property of the delivery destination together with the cargo Ownership differs according to whether the pallet is one-way, rented, recoverable, or customer-owned Confirm ownership and collection conditions in advance
An ISPM15 mark permits unrestricted disposal within Japan ISPM15 concerns phytosanitary treatment and marking and does not indicate ownership or disposal rights Confirm ownership, rental agreements, and disposal instructions separately
If delivery fails, all additional charges are borne by the delivery destination Responsibility depends on the contract, information provided, confirmation process, and cause Retain records showing why the costs arose and who issued instructions
If the POD is signed, there was no cargo abnormality The POD is important evidence, but latent damage and the scope of quantity confirmation require separate consideration If abnormalities exist, record specific reservations on the POD

Decision Checklist

Confirmation Timing Party to Confirm With Items to Confirm Actions if Issues Arise
At Delivery Request Reception Customer Number of pallets, external dimensions, weight, height, and cargo characteristics Do not finalize the vehicle until the information is complete
Before Warehouse Dispatch Warehouse Actual cargo appearance, damage, cargo shifting, and actual measurements Consider repacking, transshipment, or a vehicle change
When Confirming Delivery Conditions Delivery Destination Pallet acceptance, reception time, and booking number Obtain a booking or change the delivery date
When Confirming Cargo Handling Equipment Delivery Destination Equipment Personnel Type, capacity, and available operating hours of the forklift and other equipment Arrange suitable equipment or a cargo handling service separately
When Arranging the Vehicle Delivery Company Loading feasibility, vehicle specifications, unloading method, and access conditions Change to a smaller vehicle, power gate truck, or crane truck
When Finalizing the Work Scope Customer, Delivery Company Boundaries of delivery on vehicle, unloading, in-house delivery, and unpacking Quote the additional work and obtain written approval
When Confirming Collection Conditions Customer, Delivery Destination, Pallet Owner Leaving the pallet on-site, immediate collection, or later collection Determine the storage location, collection date, and charges
At Vehicle Arrival Driver, Delivery Destination Reception area, contact person, and unloading location Do not unload at an unauthorized location without permission
If Unloading Is Not Possible Customer, Delivery Destination, Delivery Company Cause, safe alternative method, and allowable waiting time Decide on return, alternative equipment, or redelivery
When Additional Charges Arise Customer, Delivery Company Cost items, time, unit price, cause, and approver Discuss cost allocation using supporting records
When a Cargo Abnormality Is Found Delivery Destination, Delivery Company, Insurance Parties Incident timing, cargo condition, workers, and equipment used Stop work and preserve photos and reports
At Delivery Completion Authorized Recipient Quantity, external condition, receipt signature, and reservations Record abnormalities specifically on the POD

Summary

Delivery of imported cargo on pallets is not simply a matter of transporting cargo loaded on pallets. It requires integrated confirmation of the cargo’s external dimensions, weight, center of gravity, vehicles, unloading equipment, delivery entrances, delivery routes, storage locations, scope of work, and pallet collection conditions.

In particular, pallet delivery, delivery on vehicle, unloading, in-house delivery, manual unloading, and unpacking are separate operations. Do not assume which tasks are included in the charges solely from the term "pallet delivery."

Freight forwarders must not only relay customer information to delivery companies but also confirm that the delivery terms are operationally feasible. At the same time, customers and delivery destinations must accurately provide cargo information, equipment details, vehicle restrictions, and receiving conditions.

Delivery without sufficient confirmation may cause additional charges such as Waiting Charges, return, redelivery, transshipment, storage, and pallet collection. Cost responsibility should not be determined mechanically based on the apparent cause alone, but by examining the contract, quotation terms, information provided, instruction records, and actual responses.

If safe unloading is not possible, avoid forced manual unloading or outdoor exposure. Stop the work and consider alternative methods. After delivery completion, retain the POD, receipt signatures, photos, time records, and pallet management records to document delivery completion, cargo condition, and the basis for additional charges.