What Is CY Cut? Understanding Differences from FCL Export Cutoff, VGM, and Rollover

This page is a translation for reading support. The Japanese article is the official version. For legal, customs, insurance, or regulatory decisions, please confirm against the Japanese original and the relevant parties.

What is CY Cut?

CY Cut is the deadline by which loaded FCL containers must be delivered to the container yard to be loaded onto the planned vessel for export. CY stands for Container Yard, and for FCL cargo, the stuffed container is brought into the CY in preparation for vessel loading.

If the CY Cut is missed, the container may not be loaded onto the intended vessel. This could lead to changes to the next vessel, rebooking, rearranging drayage, warehouse storage, delivery delays, or adjustments to import schedules.

CY Cut is not simply a "deadline for delivery to the port." It is a practical deadline to ensure that the actual loaded container is delivered on time to the correct CY with accurate Booking details, container number, seal number, verified gross mass (VGM), hazardous goods information, and any other required conditions for loading onto the scheduled vessel.

Scope Covered in This Article

Item Content Covered in This Article Content Covered in Other Articles in Detail
Basics of CY Cut The meaning of the cutoff date and time for bringing loaded containers into the CY in FCL export Procedures for CY in-gate itself, gate-in slips, and terminal in-gate operations are covered in the CY in-gate article
Positioning in FCL Export Reference points for back-calculating empty container pickup, stuffing, sealing, drayage, and CY in-gate FCL, integrated container transport, drayage, and stuffing are covered in their respective articles
Relation to VGM Besides CY cut, the VGM submission deadline also affects shipment VGM, VGM cutoff, and methods for submitting weight information are covered in the VGM article
Relation to Container Seals The necessity of accurately managing container numbers and seal numbers before CY in-gate Container seals, seal number discrepancies, and container number management are covered in related container articles
Notes on Special Cargo Cases where cutoff times or conditions differ for dangerous goods, reefer cargo, special containers, or heavy cargo Dangerous goods, reefer containers, special containers, and heavy cargo are covered in their respective articles
Response to Delays Changing to the next vessel, modifying bookings, additional costs, and schedule impact in case of CY cut delays Booking changes, schedule adjustments, blank sailings, and rollovers are covered in their respective articles
Difference from Rollover Differences between CY cut delays caused by the shipper or prior processes and vessel schedule changes due to carrier reasons Rollover, carrier space shortages, and vessel schedule changes are covered in the rollover article
Freight Forwarder Process Management Methods to organize confirmations with shipper, warehouse, drayage company, and carrier using CY cut as the reference point Integrated freight forwarder arrangements, export schedule management, and SI cutoff are covered in their respective articles

CY Cut Is Not Just a Deadline for Bringing Containers to the Port

The CY cut is not simply a deadline for delivering containers to the port. It is the cut-off time by which containers must be brought to the correct CY with accurate information in order to be loaded onto the scheduled vessel.

Even if the container arrives at the CY, if there are deficiencies in the booking information, container number, seal number, VGM, destination CY, dangerous goods details, or special cargo requirements, it could cause issues with loading. Therefore, the CY cut must manage not only the physical delivery of containers but also the documentation, weight information, and shipment conditions.

The Positioning of CY Cut in FCL Export

In FCL export, the process begins with booking the vessel and picking up the empty container. After that, stuffing (banning) is done at the shipper's factory, warehouse, or designated warehouse, and the container is sealed. The fully loaded container must then be delivered to the CY before the CY cut-off time.

In other words, the CY cut-off serves as the reference point to work backward for arranging empty containers, stuffing, applying the seal, submitting the VGM, and arranging drayage. Without a confirmed CY cut-off, it is not possible to accurately schedule the export FCL operations on site.

Process Relation to CY Cut Parties to Confirm With Practical Points to Note
Booking Starting point for confirming the vessel, voyage number, destination CY, and CY cut-off Shipping line, NVOCC, freight forwarder Changes in booking may cause CY cut-off to change
Empty Container Pickup Pickup of empty containers is scheduled backward from CY cut-off Shipping line, depot, drayage company Align empty container pickup date with stuffing date
Stuffing (Banning) Loading cargo into the container before CY in-gate Shipper, warehouse, loading operators Watch for cargo unpreparedness, shortage of workers or forklifts
Container Sealing Sealing after stuffing and communicating seal number to stakeholders Warehouse, shipper, freight forwarder Do not mix up container numbers and seal numbers
VGM Submission Separate submission deadline for verified gross mass besides CY in-gate Shipper, freight forwarder, shipping line Even if arrived at CY on time, shipment may be affected if VGM is not submitted
Drayage Arrangement Transport method to deliver the loaded container to CY by the cut-off Drayage company, warehouse, freight forwarder Arrange factoring in road/port congestion and vehicle shortages
CY In-Gate Final step of delivering the fully loaded container to the designated CY Drayage company, terminal, shipping line Do not make mistakes on destination CY, gate opening times, or delivery conditions

Differences Between CY Cut, CFS Cut, VGM Cut, and SI Cut

Cutoff Name Main Target Meaning of Cutoff Impact of Delay Practical Notes
CY Cut FCL export loaded containers Cutoff by which containers must be delivered to the CY to be loaded on the scheduled vessel Containers cannot be loaded on the scheduled vessel, resulting in vessel change or additional fees Confirm destination CY, container number, seal number, and drayage arrangement
CFS Cut LCL export cargo Cutoff by which consolidated cargo must be delivered to the CFS Cannot be loaded into the consolidated container on time Manage separately from the FCL CY cut
VGM Cut Container weight information for loading Deadline for submitting the Verified Gross Mass (VGM) to the carrier or designated system Cannot be reflected in the stowage plan, causing loading disruptions Even if CY delivery is on time, failure to submit VGM is problematic
SI Cut Information for B/L creation, Shipping Instruction Deadline for submitting shipping instructions required for B/L preparation Delays in B/L issuance, document errors, or inconsistencies in shipping details Verify product name, shipper name, consignee name, Notify Party, and freight terms
Dangerous Goods Documentation Cut Dangerous and regulated cargo Deadline related to submitting dangerous goods declaration, SDS, and carrier approval Booking refusals, denied delivery, and shipment suspension May have an earlier cutoff than normal cargo

Basic Information Freight Forwarders Confirm

Check Item Details to Confirm Party to Confirm With Practical Notes
Vessel Name and Voyage Number Scheduled vessel and voyage number Shipping line, NVOCC Reconfirm CY cut-off when vessel changes
Booking Number Relevant booking and number of containers Shipping line, freight forwarder, shipper Avoid confusion when multiple bookings exist
Destination CY Designated terminal, CY name, in-gate location Shipping line, terminal, drayage company Terminals may differ even within the same port
CY Cut-off Date and Time In-gate deadline date and time Shipping line, NVOCC, terminal Confirm both date and time
Container Size and Type 20ft, 40ft, HC, Reefer, Open Top, etc. Shipper, shipping line, drayage company Special containers may have different cut-off deadlines than regular cargo
Hazardous or Special Cargo Status Presence of hazardous materials, frozen/refrigerated, heavy cargo, or special cargo Shipper, manufacturer, shipping line Additional documentation or earlier approval deadlines may apply
VGM Submission Deadline Deadline and submission method for Verified Gross Mass (VGM) Shipping line, shipper, freight forwarder Manage separately from the CY cut-off deadline
Drayage Arrangement Status Vehicle arrangements for empty container pickup, stuffing, and loaded container in-gate Drayage company, warehouse, freight forwarder Allow buffer time assuming port congestion and vehicle shortages

Practical Scheduling Based on CY Cut-off Time

In FCL export, scheduling is planned by counting backwards from the CY cut-off time. First, confirm the deadline for delivering the container to the CY. Then, check the time required for stuffing, the earliest date for picking up empty containers, drayage vehicle availability, and the shipper’s cargo preparation status.

For example, if the CY cut-off is set for Friday morning, stuffing may need to be completed by the day before. Considering factory working hours, drayage company pick-up times, port congestion, and road traffic, tight scheduling poses risks.

Item for Backward Calculation When to Confirm Main Points to Check Impact if Delayed
Cargo Preparation Immediately after CY cut-off is confirmed Packing, inspection, labeling, export documents, weight information Stuffing cannot be done, causing delay in CY in-gate
Empty Container Pickup Count backwards from planned stuffing date Pickup availability date, depot, container condition Stuffing schedule shifts
Stuffing Day Set for day before CY cut-off or with buffer Staff, forklifts, loading location, working hours Delays in actual stuffing affect drayage arrangements
Seal Number Notification Immediately after stuffing completion Container number, seal number, photos, stowage details Causes issues with document preparation and in-gate confirmation
VGM Submission Before VGM cut-off Total weight, weighing method, submission destination, submitter Not reflected in shipping plan; could disrupt vessel loading
CY In-gate Well before CY cut-off Gate time, delivery location, road conditions, port congestion May result in cargo missing the scheduled vessel

Relationship with VGM Cut-off

For FCL exports, in addition to the CY cut-off, it is also necessary to check the deadline for submitting the VGM. VGM refers to the Verified Gross Mass information of the container being shipped. Shipping companies and terminals manage vessel stowage based on the container’s weight information.

Even if the container arrives by the CY in-gate cut-off, a late VGM submission or errors in the VGM data could disrupt the vessel loading process. Therefore, freight forwarders confirm both the CY cut-off and the VGM cut-off deadlines.

Relation to Container Seals

Containers brought into the CY by the CY cut-off time are usually fully stuffed and sealed with container seals. Container numbers and seal numbers are crucial information in shipping documents and communications among the involved parties.

If the seal number notification is delayed or if the number on the documents differs from the actual seal number, verification procedures may be required. When handling multiple containers simultaneously, it is essential to carefully manage the pairing of container numbers and seal numbers to avoid mistakes.

Differences Between CY Cut Delays and Rollovers

Item CY Cut Delay Rollover Practical Differentiation
Main Causes Delays in cargo prep, bunning, drayage, VGM, or in-gate confirmation Carrier’s space issues, port congestion, vessel delay, schedule changes Confirm whether the delay is due to shipper-side processes or carrier-side issues
Container Status Often the container has not been gate-in by the CY cut-off time Container may have been gate-in but not loaded onto the planned vessel Check gate-in time, in-gate records, and carrier notifications
Parties to Explain To Shipper, warehouse, drayage company, importer Shipper, importer, carrier, local stakeholders Adjust explanation content according to the cause of the delay
Main Responses Book next vessel, rearrange drayage, warehouse storage, reschedule delivery Confirm alternative vessel with carrier, verify revised ETA, adjust importer’s plan Do not fix import-side schedule until the next vessel is confirmed
Cost Occurrence Rebooking fees, storage charges, drayage waiting fees, cancellation fees Storage fees, demurrage, costs due to delayed delivery may become issues Verify the cause of costs and responsible party through records

Common Misconceptions

Common Misconception Actual Understanding Practical Notes
CY cut-off means the deadline is arrival at the port Containers must be delivered to the correct CY with the correct booking information by the cut-off time Confirm the destination CY, booking number, and container number
If the container arrives by the CY cut-off, it will definitely be loaded on the scheduled vessel Even if the container is delivered to the CY, rollover may occur due to space issues or vessel schedule changes Verify completion of container delivery and vessel loading separately
CY cut-off and VGM cut-off are the same CY cut-off is the delivery deadline; VGM cut-off is the deadline for submitting weight information Manage both cut-offs separately
The same cut-off date applies to FCL and LCL FCL is managed by CY cut-off, while LCL is managed by CFS cut-off Check the cut-off name and delivery location according to the transport type
Drayage arrangements can be handled even the day before Last-minute arrangements are risky due to vehicle shortages, port congestion, and traffic delays Secure vehicles by working backwards from the stuffing date and CY cut-off
Seal numbers can be provided later Seal numbers affect shipping documents and coordination among stakeholders Share accurate seal numbers immediately after stuffing is complete
Dangerous goods can follow the same cut-off as regular cargo Dangerous goods often require earlier shipping line approval, documentation, and delivery conditions Confirm dangerous goods cut-offs before or immediately after booking
If a container misses the CY cut-off, it will automatically be shipped on the next vessel Booking for the next vessel, space availability, delivery conditions, and extra charges must be confirmed Check with the shipping line or NVOCC about next sailing availability

Common Practical Issues

Case What Causes Problems Cause Practical Response
Delay in cargo preparation Unable to start stuffing; unable to meet CY in-gate cutoff Packing, inspection, label application, or export documents incomplete Advise the shipper of the cargo readiness deadline by calculating backward from the CY cutoff
Delay in picking up empty container Late start of stuffing Depot congestion, shortage of empty containers, incomplete pickup information Confirm empty container pickup availability and drayage arrangement early
Stuffing work took longer than planned Delay in making the loaded container, preventing drayage departure Insufficient workers, uneven cargo sizes, inadequate loading space Confirm work hours, forklift availability, and loading sequence in advance
Failed to secure drayage truck Unable to in-gate loaded container by CY cutoff Last-minute arrangement, busy season, port congestion Secure trucks early and set buffer days
Mistaken delivery to wrong CY Need to re-deliver to correct terminal Insufficient confirmation of shipping line, route, or terminal information Cross-check Booking Confirmation with terminal information
Late VGM submission May disrupt vessel loading even after CY in-gate Unconfirmed weight information, unclear submitter, system submission omission Set VGM submission deadline and responsible submitter in advance
Incorrect seal number Obstructs document reconciliation, in-gate confirmation, and B/L issuance Mix-up of multiple container numbers Manage container number and seal number as a set
Dangerous goods documents not approved Cannot proceed on the same schedule as normal cargo; shipment may be refused Insufficient confirmation of SDS, hazardous goods declaration, and carrier approval Obtain carrier approval for dangerous goods earlier than normal cargo

Comparison Table of Freight Forwarder Involvement Scope

Category Tasks Easily Supported Matters Not to Be Definitively Stated Practical Measures
CY Cut Confirmation Confirm CY cut-off date/time and designated CY with the shipping line or NVOCC Do not assume once confirmed that the CY cut-off will not be changed Reconfirm when vessel changes, route changes, or terminal changes occur
Reverse-Scheduled Planning Calculate backwards from shipment readiness, empty container pickup, stuffing, drayage, and VGM Do not assume cargo preparation by the shipper will be completed as scheduled Clearly communicate deadlines to the shipper and share impact of any delays
Drayage Arrangement Arrange vehicles, pickup times, and gate-in schedule adjustments Avoid scheduling too tightly on the assumption of no road or port congestion Allow buffer time considering busy seasons and anticipated port congestion
VGM Management Organize VGM submission deadlines, submitters, and submission methods Do not explain that shipment preparation is complete simply by CY in-gate Manage CY cut-off and VGM cut-off separately
Seal Number Management Organize container numbers, seal numbers, photos, and gate-in information Do not assume the numbers provided by the shipper are always correct For multiple seals, cross-check with a consolidated list
Special Cargo Handling Confirm additional cut-off times for dangerous goods, reefers, and heavy cargo Do not assume cut-off times are the same as for general cargo Early confirmation of shipping line approval, gate-in conditions, and required documents
Delay Response Organize next vessel options, booking changes, import-side ETA, and additional costs Do not explain that automatic transfer to the next vessel is guaranteed Confirm space availability and conditions with shipping line or NVOCC

Decision Checklist

Confirmation Stage Party to Confirm With Items to Confirm Actions if Issues Arise
When Obtaining Booking Shipping line, NVOCC, Freight forwarder Vessel name, voyage number, booking number, destination CY, CY cut-off date/time Re-acquire Booking Confirmation if any details are unclear
When Arranging Empty Container Shipping line, depot, drayage company Empty container pick-up date, depot location, container size, pick-up conditions Reschedule stuffing date if pick-up is not possible
Before Stuffing Shipper, warehouse, operators Cargo readiness, packaging, inspection, workers, forklifts, loading location If not ready, promptly share impact on CY cut-off
After Stuffing Warehouse, shipper, freight forwarder Container number, seal number, photos, loading completion time Correct any number mismatches before in-gate
Before VGM Submission Shipper, freight forwarder, shipping line VGM weight, submission deadline, submitter, submission method Notify that failure to submit may affect shipment
Before CY In-Gate Drayage company, terminal, shipping line Destination CY, gate hours, in-gate conditions, road/port congestion Advance departure time if congestion is expected
If CY Cut-off Delay Is Likely Shipper, shipping line, NVOCC, drayage company Current location, estimated arrival, cut-off time, next vessel availability Confirm next vessel arrangements, booking changes, and cost responsibility
Upon Receiving Rollover Notification Shipping line, NVOCC, shipper, import side Cause, next vessel, ETA, additional charges, import-side impact Delineate causes between CY cut-off delay and rollover

Scenario 1: When Cargo Preparation Delays Prevent Vanning

The CY cut-off is Friday morning, but the shipper’s packing and inspection are not completed until Thursday evening, so the planned vanning cannot start. If the cargo is not ready, even if empty containers and drayage trucks have been arranged, a loaded container cannot be created.

In this case, the freight forwarder needs to communicate not only the CY cut-off but also the cargo preparation deadline, the earliest possible vanning start time, and the drayage departure time back-calculated to the shipper. If cargo preparation is delayed, the possibility of changing the vessel or modifying the booking should be shared with the shipper as early as possible.

Scenario 2: Unable to Secure Drayage Vehicle and Miss CY In-Gate Deadline

Although the container stuffing (vanning) is complete, during peak seasons or due to port congestion, it may not be possible to secure a drayage vehicle, resulting in the loaded container missing the CY cut-off for in-gate. Even if the container is ready, failure to gate in at the CY may mean it cannot be loaded onto the scheduled vessel.

In this situation, drayage arrangements should not be made just before the CY cut-off but coordinated as a series of steps including empty container pickup, stuffing, and CY in-gate. The freight forwarder should plan the in-gate schedule with sufficient buffer time, considering drayage availability, port congestion, and road conditions.

Scenario 3: CY In-Gate Completed but VGM Not Submitted, Causing Shipment Issues

In this case, although the loaded container was in-gated by the CY cut-off time, the delayed submission of the Verified Gross Mass (VGM) means the carrier cannot incorporate the weight information into their loading plan. Even after CY in-gate is completed, missing weight data may cause problems with shipment.

Here, CY cut-off and VGM cut-off should not be treated as the same deadline but managed separately. The freight forwarder should confirm the VGM submitter, submission method, and deadline at the time of booking, ensuring the weight information can be finalized promptly after stuffing.

Scenario 4: In-gate Confirmation Halted Due to Seal Number Discrepancy After Cargo Receipt

In export cases handling multiple containers simultaneously, there are instances where the container number and seal number combination is mistakenly communicated. Even if the actual cargo has been brought into the CY, if the numbers on the documents do not match the physical information, a confirmation process will be triggered.

In such cases, it is necessary to manage and share a consolidated list of container numbers, seal numbers, photos, and scheduled in-gate dates at the time of vanning completion among the shipper, warehouse, freight forwarder, and shipping company. For multi-container shipments, it is important not to manage numbers verbally.

Scenario 5: CY-Cut Met but Cargo Rolled Over

Even though the loaded container was properly delivered by the CY cut-off time, it may not be loaded onto the scheduled vessel due to carrier space constraints, port congestion, or vessel schedule changes. In such cases, this should be handled as a rollover, not as a CY cut-off delay.

The freight forwarder should verify the delivery records, gate-in time, notifications from the carrier, and the subsequent vessel information, then clarify the cause to the shipper. Whether the CY cut-off was missed or the container was in-gated but rolled over due to the carrier’s circumstances affects cost liabilities and delivery schedule explanations.

Scenario 6: Inability to CY In-Gate Due to Delayed Prior Approval of Dangerous Goods

For dangerous goods cargo, when only the CY cut-off is checked as if it were regular cargo, there may be situations where the dangerous goods declaration, SDS, carrier approval, or in-gate conditions are not confirmed in time, causing delays in in-gate or loading.

For dangerous goods, reefers, special containers, and heavy cargo, different cut-off and approval requirements may apply compared to regular cargo. Freight forwarders need to confirm not only the CY cut-off but also the dangerous goods documentation deadlines, carrier approval timing, and terminal acceptance conditions well in advance.

Summary

CY cut-off refers to the deadline by which a loaded FCL export container must be delivered into the CY to be loaded onto the scheduled vessel. Missing this deadline could result in the container not being loaded on the intended vessel, potentially causing vessel rescheduling, booking changes, additional costs, and delivery delays.

In practice, tasks such as cargo preparation, empty container pickup, stuffing, container sealing, VGM submission, drayage arrangement, and CY in-gate are scheduled backward from the CY cut-off time. The CY cut-off is not an isolated deadline but serves as a key reference point to manage the entire preceding process of FCL export operations.

It is also important to distinguish between cases where the CY cut-off is missed and cases where, despite timely CY in-gate, the carrier does not load the container on the scheduled vessel due to their operational reasons, known as rollover. When a freight forwarder undertakes door-to-door transport, the CY cut-off should be managed as a control date for the entire FCL export process, and early coordination with the cargo owner, warehouse, drayage company, and carrier is crucial.