Vessel Schedule

This page is a translation for reading support. The Japanese article is the official version. For legal, customs, insurance, or regulatory decisions, please confirm against the Japanese original and the relevant parties.

Vessel Schedule

A vessel schedule is planned operational information showing which ports a vessel is expected to call at, in what sequence, and when it is expected to depart from and arrive at each port.

In ocean transport operations, the schedule is reviewed together with the vessel name, voyage, shipping line, service name, port of loading, port of discharge, ETD, ETA, CY cut-off, port rotation, transshipment port, connecting vessel and whether the service is direct or involves transshipment.

For a shipper or cargo owner, it is basic information used to understand when cargo is expected to depart, arrive and become available for use or delivery.

For a freight forwarder, it is management information used to organize the booking, empty-container pickup, vanning, VGM submission, export customs clearance, drayage, CY delivery, B/L issuance, Arrival Notice, D/O procedures, import customs clearance, cargo pickup, domestic delivery and final receipt.

A vessel schedule is planned information, not a confirmed operational result. It may change after booking because of port congestion, severe weather, delay from a previous voyage, fleet adjustment, port rotation change, port omission, blank sailing, rollover or a change to the transshipment connection.

A vessel schedule should therefore not be treated as information that is checked once and then left unchanged. Planned information, revised information, actual events and the cargo's current status must be compared throughout the transport.

Scope of This Article

Item Covered in This Article Covered in Other Articles
Overall vessel-schedule structure How to read vessel, voyage, port, time, route, deadline and change information as an integrated set Individual delay causes and operational events are covered in the relevant articles
ETD and ETA Their position within the vessel schedule and effect on related operations Basic meanings and the distinction between ETA and the expected delivery date are covered in “ETD and ETA”
CY cut-off Its role as a critical export deadline that must be managed separately from the ETD Backward planning for vanning, customs clearance, drayage and CY delivery is covered in “Relationship Between CY Cut-off and Vessel Schedule”
Post-booking change Basic identification of what changed and which operation is affected Review, communication, rearrangement and record management are covered in “Schedule Change After Booking”
Cancelled sailing, rollover and port omission Differences and affected areas within the overall schedule Details are covered in “Blank Sailing,” “Rollover” and “Port Omission”
Port rotation change A change in sequence where the vessel still calls at the relevant port Detailed review is covered in “Port Rotation Change”
Transshipment How to read the first leg, transshipment port, connecting vessel and final ETA Missed connections and cargo held at the transshipment port are covered in “Transshipment Delay”
Typhoon and severe weather Initial review of cascading effects on the vessel, port, terminal, CY and delivery Details are covered in “Delay Due to Typhoon and Bad Weather”
Delivery schedule Basic review of the separate operations between the ETA and final delivery Detailed revision of the delivery date is covered in “Delivery Date Rescheduling”
Additional costs and insurance Initial identification of costs and possible physical cargo damage after a schedule change Details are covered in “Additional Costs Due to Delay,” “Delay and Demurrage / Detention” and “Delay and Marine Cargo Insurance”

This article serves as the entry point for vessel-schedule and delay-management operations by explaining what information should be reviewed, in what sequence and for what operational purpose.

Main Information Contained in a Vessel Schedule

Item Meaning Main Operational Use Review Caution
Vessel name Name of the vessel expected to carry the cargo Booking, B/L, tracking and Arrival Notice The same vessel may operate several voyages
Voyage Voyage number identifying the relevant sailing Identification of the sailing, port calls, B/L and Arrival Notice Do not identify the shipment from the vessel name alone
Service name Name used by the shipping line for the route or scheduled service Port calls, frequency and direct or transshipment structure Different services between the same ports may have different routes and transit times
Port of loading Port where the cargo is loaded on the vessel CY delivery, export declaration, B/L and drayage Confirm the terminal or CY as well as the port
Port of discharge Port where the cargo is discharged from the vessel D/O, import declaration, cargo pickup and domestic delivery It may differ from the final place of delivery
ETD Estimated time or date of departure Export workflow, shipment planning and commercial timing It is not the actual departure time
ETA Estimated time or date of arrival Arrival Notice, customs, pickup and delivery preparation It is not the berthing time, cargo-availability date or delivery date
CY cut-off Deadline for delivery of the laden container to the designated CY Vanning, customs, drayage and CY-delivery management It does not automatically move when the ETD changes
SI and VGM deadlines Deadlines for the Shipping Instruction and VGM B/L preparation, stowage and safety review Manage them separately from the CY cut-off
Port rotation Sequence in which the vessel calls at ports ETD, ETA, connection and route review A change may move a port earlier or later
Transshipment port Intermediate port where the cargo is transferred to another vessel Connecting-vessel and final-ETA management Arrival of the first leg does not establish successful connection
Connecting vessel Vessel carrying the cargo on the next transport leg Final-arrival review for transshipment cargo Distinguish the planned vessel, confirmed loading and actual departure
Direct or transshipment service Whether the cargo remains on one vessel or transfers during transport Comparison of lead time, cost and delay risk Review connection reliability as well as the shortest transit time

A vessel schedule is not merely a table of ETDs and ETAs. It is integrated management information connecting the vessel, voyage, ports, deadlines, route, connections and cargo operations.

Information Layers Within a Vessel Schedule

Information Layer Main Items Operational Role Review After a Change
Vessel and voyage information Vessel, voyage, shipping line and service Identify the relevant transport sailing Vessel substitution, voyage change and booking migration
Port and route information Loading port, discharge port, port calls, rotation and transshipment port Identify the route followed by the cargo Port omission, rotation change, alternative port and revised route
Time information ETD, ETA, CY cut-off, SI deadline and VGM deadline Build the export and import workflows Earlier or later timing and whether deadlines move together
Export-operation information Booking, empty container, vanning, customs, CY delivery and B/L Manage backward planning for loading Cargo readiness, permission, documents and loadable status
Import-operation information Arrival Notice, D/O, import customs, cargo pickup, delivery and receipt Build the process after arrival Berthing, handling, terminal availability, permission and vehicles
Change and delay information Blank sailing, port omission, port rotation change, rollover and transshipment delay Identify the difference from the original plan and affected operations Cause, cargo status, alternative, cost and notice
Actual-event information Actual loading, departure, arrival, handling completion and cargo availability Replace planned information with actual events Whether a plan is being mistaken for an actual event

A schedule change should be analyzed by identifying which information layer changed rather than describing it only as a date change.

Planned, Revised and Actual Information

Information Type Typical Example Operational Use What It Does Not Establish
Planned information Booking ETD, ETA, CY cut-off and intended vessel Build the workflow, quotation and provisional delivery plan Actual loading, departure or arrival as planned
Revised information Revised ETD, revised ETA, replacement vessel or rotation change Update operations, documents and related appointments That the revision is the final change
Cargo-status information Delivered to CY, awaiting loading, held at transshipment port or awaiting terminal availability Identify where the cargo is and what event is pending Individual cargo status based solely on the general vessel schedule
Actual-event information Actual loading, departure, arrival or handling completion Replace the planned event with an actual result Cargo availability or final delivery based on arrival alone
Forecast information Expected berthing, handling completion or cargo availability Provide provisional preparation information A confirmed operational or delivery appointment

Communications should also distinguish planned, forecast, under-review and confirmed information.

Relationship with the Booking Confirmation

A Booking Confirmation is issued by the shipping line or NVOCC to confirm the reservation information available when the booking is accepted.

It commonly shows the booking number, vessel, voyage, loading port, discharge port, ETD, ETA, CY cut-off, SI deadline, VGM deadline, receiving location, number and type of containers and transshipment information.

The Booking Confirmation is important evidence that the booking was accepted and shows the planned conditions at that time. It does not necessarily guarantee that the vessel schedule will remain unchanged until completion of carriage.

However, the fact that the schedule is provisional does not permit the freight forwarder to omit later review or communication. The individual booking, revised notices, vessel status, terminal information and cargo status should continue to be reviewed.

Review Stage Booking Confirmation Information Additional Review Operational Purpose
When issued Vessel, voyage, ports, ETD, ETA, deadlines and receiving location Cargo conditions, dangerous goods or special-cargo approval and freight terms Establish the initial export workflow
Before the CY cut-off Latest cut-off, SI and VGM deadlines and receiving location Terminal instructions, vessel change and gate restrictions Prepare the cargo in a loadable condition
Before loading Intended vessel, voyage and revised notice Loading plan, rollover, port omission and blank sailing Confirm loading feasibility
After departure Booked vessel and route Actual loading, departure, transshipment port and connecting vessel Confirm that the individual cargo is moving
Before arrival Discharge port and ETA Berthing, handling, Arrival Notice and expected cargo availability Prepare import and delivery operations

Vessel-Schedule Information Lifecycle

Stage Information to Review Operational Purpose What Cannot Yet Be Treated as Confirmed
Quotation and proposal Route, direct or transshipment service, estimated ETD and ETA, frequency and lead time Compare transport options, cost and delivery timing Loading on a particular vessel or confirmed arrival
Booking Vessel, voyage, ETD, ETA, CY cut-off, receiving location and deadlines Make the reservation and build the export workflow That no change will occur during carriage
Cargo preparation Empty container, vanning, documents, cargo approval and customs schedule Plan backward from the CY cut-off That cargo preparation alone confirms loading
Before the CY cut-off Latest deadline, receiving location, gate restriction, export permission and vehicle Complete the cargo-side loading requirements Automatic extension because the vessel is delayed
Before loading Vessel status, blank sailing, port omission, port rotation change and rollover Confirm loading and document information Actual loading based only on the booking
After departure Actual loading, departure, transshipment port, connecting vessel and final ETA Track the actual movement of the cargo Final arrival based only on first-leg departure
Before arrival ETA, berthing, handling, Arrival Notice, D/O and customs preparation Prepare customs, pickup and delivery Cargo availability or delivery from the ETA alone
After arrival Actual arrival, berthing, handling completion, terminal availability, import permission and pickup appointment Confirm the expected delivery date Cargo availability based solely on vessel arrival

Relationship with ETD and ETA

ETD and ETA are critical time elements within the vessel schedule.

ETD is the estimated departure time or date, and ETA is the estimated arrival time or date. Neither directly establishes actual loading, departure, berthing, handling, cargo availability or final delivery.

Information Meaning Related Operations Information That Must Remain Separate
ETD Estimated departure Export workflow, shipment plan and connection plan CY cut-off, actual shipment date and actual departure
Actual Departure Time when the vessel actually departed Commencement of the voyage and updated arrival outlook Actual loading of the individual cargo
ETA Estimated arrival Customs, D/O, pickup and delivery preparation Berthing, handling completion, cargo availability and delivery
Actual Arrival Time when the vessel actually arrived at the port Review of berthing and handling Terminal availability or pickup date
Cargo-availability date Date on which the cargo or container can be collected Drayage, customs and delivery ETA or actual arrival
Expected delivery date Date that satisfies customs, pickup, delivery and receiving requirements Final delivery and customer communication ETA

Relationship with the CY Cut-off

The CY cut-off is one of the most important vessel-schedule items for export operations.

It is the deadline for delivery of the laden export container to the CY designated by the shipping line or terminal. It is separate from the ETD and does not necessarily move later when the vessel is delayed.

Schedule Situation Effect on ETD Possible Effect on CY Cut-off Operational Response
Vessel delay Moves later May remain unchanged, move later or be individually revised Confirm the individual booking and terminal instruction
Earlier port rotation May move earlier May also move earlier Recalculate vanning, customs and drayage
Vessel substitution Changes to the replacement vessel's schedule The deadline or receiving location may change Update all operations from the revised booking
Blank sailing The intended sailing no longer operates Changes to the next sailing's deadline Review the next vessel, alternative route and storage
Loading-port omission The vessel cannot load at the intended port Confirm the deadline for another port or later vessel Review alternative loading, next vessel and export declaration

Direct and Transshipment Services

Comparison Direct Service Transshipment Service Review Caution
Vessel structure The cargo normally remains on one vessel The cargo is transferred to another vessel Review each vessel and voyage in a transshipment route
Main times Loading-port ETD and discharge-port ETA First-leg ETD, transshipment-port ETA, connecting-vessel ETD and final ETA Do not confuse an intermediate ETA with the final ETA
Main delay risk Vessel delay, port congestion, severe weather and handling delay First-leg delay, missed connection, waiting for the next vessel and connection change A delay of several hours may be amplified into several days
Tracking Primarily follows one vessel movement Requires arrival, discharge, connection, loading and departure review Distinguish the planned connection from actual loading
Customer communication Explains the vessel position and discharge-port ETA Explains the cargo location, connection status and next vessel Do not describe first-leg departure as successful final transport

Main Types of Vessel-Schedule Change

Change or Delay Description Mainly Affected Information First Point to Confirm Related Article
ETD or ETA change Departure or arrival moves earlier or later CY cut-off, customs, pickup, delivery and receipt Cause, actual event and effect on other deadlines ETD and ETA
Vessel or voyage change The intended vessel or voyage changes Booking, B/L, Shipping Instruction and Arrival Notice Revised booking and actual loading vessel Schedule Change After Booking
CY cut-off change The container-delivery deadline changes Vanning, customs, drayage and CY delivery Latest deadline, receiving location and notice time Relationship Between CY Cut-off and Vessel Schedule
Blank sailing The intended sailing is cancelled or suspended Next vessel, booking, delivery timing and storage Replacement sailing and booking transfer Blank Sailing
Rollover The vessel operates but individual cargo is not loaded Shipment date, next vessel, B/L and costs Loadable status, cause and next-vessel space Rollover
Port omission The vessel operates but does not call at a specific port Loading port, discharge port, customs location and delivery route Affected port, alternative port and cargo status Port Omission
Port rotation change The order of port calls changes ETD, ETA, CY cut-off and connections Whether the relevant port moves earlier or later Port Rotation Change
Transshipment delay The cargo misses the intended connecting vessel Connecting vessel, final ETA and delivery Cargo status, next vessel and actual loading Transshipment Delay
Typhoon or severe weather Voyage, berthing, handling, CY or delivery is interrupted ETD, ETA, handling, cargo availability and delivery Which operation is currently suspended Delay Due to Typhoon and Bad Weather
Vessel arrival delay The vessel will call at the port but arrival or post-arrival handling is delayed Berthing, handling, terminal availability and cargo pickup Vessel position and expected cargo availability Vessel Arrival Delay

Basic Vessel-Schedule Review Flow

  1. Identify the cargo: Confirm the shipper or cargo owner, booking number, B/L number, container number and cargo.
  2. Identify the vessel: Confirm the vessel, voyage and service name.
  3. Confirm the route: Review the loading port, discharge port, port calls, transshipment port and final destination.
  4. Confirm planned times: Review the ETD, ETA, connecting-vessel ETD and final ETA.
  5. Confirm export deadlines: Review the CY cut-off, SI deadline, VGM deadline and cargo-approval deadlines.
  6. Confirm current cargo status: Determine whether the cargo is before CY delivery, in the CY, loaded, at sea, at a transshipment port or at the discharge port.
  7. Review changes: Check for vessel substitution, blank sailing, port omission, port rotation change or rollover.
  8. Confirm actual events: Review actual loading, departure, arrival, handling completion and cargo availability.
  9. Review export-document effects: Confirm the Shipping Instruction, B/L, export declaration, L/C requirements and certificates.
  10. Review import-operation effects: Confirm the Arrival Notice, D/O, import declaration, pickup and delivery.
  11. Recalculate delivery: Use cargo availability, vehicle capacity and receiving conditions rather than the ETA alone.
  12. Review costs and physical damage: Confirm rescheduling costs, storage, Demurrage, Detention and possible physical cargo damage.
  13. Notify the relevant parties: Separate confirmed, planned, under-review and next-update information.

Different Use on the Export and Import Sides

Information Export-Side Purpose Import-Side Purpose Common Caution
ETD Manage shipment, documents and connection timing Review commencement of carriage and arrival outlook Keep it separate from actual departure
ETA Communicate expected arrival to the buyer or overseas party Prepare customs, cargo pickup and delivery Keep it separate from the delivery date
CY cut-off Plan cargo preparation, customs and drayage backward Use it when reviewing the cause of a shipment delay Manage it separately from the ETD
Vessel and voyage Use for the booking, Shipping Instruction, B/L and export declaration Use for the Arrival Notice, D/O and import declaration Remove obsolete information after a change
Transshipment and connection Review expected arrival and any transshipment conditions Review final ETA and route reliability Do not rely only on the first leg
Change notice Reschedule vanning, customs, CY delivery and documents Reschedule the D/O, customs, pickup and delivery Preserve receipt and communication times

Relationship with Additional Costs

Cost Item Typical Situation Documents and Records Allocation Consideration
Drayage rescheduling The CY cut-off, vessel or receiving location changes Vehicle record, change notice and cancellation terms Notice time, instructing party and possible avoidance
Warehouse storage Shipment or delivery is postponed Storage period, invoice and change history Whose circumstances extended storage
Waiting or cancellation charge A vehicle, handling operation or appointment changes Waiting record, booking record and notice time Whether the cost could have been avoided
Document-amendment charge The vessel, voyage, port or date changes Amendment request, history and invoice Cause of amendment and document responsibility
Demurrage The import container remains in the terminal beyond Free Time Terminal availability, pickup, Free Time and charge details Commencement, suspension, waiver and delay cause
Detention The container is returned after the applicable Free Time Pickup, return, Free Time and delivery record Return feasibility, receiving conditions and depot requirements
Receiving-appointment change The ETA or cargo-availability date changes Appointment, amendment history and charge terms Whether it is a transport cost or commercial cost

The existence of a schedule change and the right to recover the resulting cost from the shipping line, NVOCC, freight forwarder, shipper or cargo owner are separate issues.

The contract, B/L terms, booking conditions, cause, entrusted work, nature and place of the cost, instructions, approval and possible mitigation must be reviewed.

Relationship with Marine Cargo Insurance

A vessel-schedule change or arrival delay alone may not be covered by ordinary marine cargo insurance.

Where severe weather, transshipment handling, extended storage, container damage, temperature deviation or another accident causes physical cargo damage, the physical loss must be reviewed separately from the delay.

Situation Main Issue Documents and Records Initial Action
Only the ETA moves later Delay or commercial loss Vessel status, change notice and contract terms Do not assume insurance coverage; review “Delay and Marine Cargo Insurance”
Wet damage is discovered after severe weather Physical cargo damage Photographs, external condition, container condition and receipt record Notify the insurer, carrier and relevant parties promptly
Damage is found after transshipment-port delay Handling or storage damage Transfer history, handling record, seal and survey Investigate the probable transport leg and cause
Temperature deviation affects reefer cargo Combined delay, equipment and power-management issue Temperature, power, alarm and equipment records Review physical damage separately from the delay

Cases That Commonly Cause Operational Problems

Case Main Issue Documents to Check Decision Point Initial Response
A different voyage of the same vessel is reviewed Wrong sailing identified Booking, voyage, ports and dates Whether the vessel name was used without the voyage Reidentify the sailing from the booking number and voyage
The ETD moves later and the CY cut-off is assumed to move later Confusion between separate deadlines Revised booking, terminal instruction and gate record Whether an actual cut-off amendment was issued Confirm the latest deadline and rebuild the delivery workflow
The ETA is communicated as the delivery date Confusion between arrival and cargo availability ETA, handling, customs, pickup and delivery schedule Whether post-arrival operations were considered Recalculate the expected delivery date
No further review occurs after the Booking Confirmation Revised notice or vessel change is missed Notice history, revised booking and vessel status When the change could have been identified Update the information and notify the parties
First-leg departure is communicated as confirmation of final arrival Transshipment connection not reviewed Transshipment port, connecting vessel, loading and departure Whether the connection has actually been completed Confirm cargo status and final ETA
The draft B/L still shows the replaced vessel Document does not match actual transport Revised booking, draft B/L and actual loading Whether the document matches the actual vessel and voyage Correct the vessel, voyage and shipment date
A port rotation change moves the ETD earlier Insufficient time for the CY cut-off and customs Revised schedule, cut-off and operational plan Whether the cargo can meet the earlier deadline Review cargo preparation and an alternative vessel in parallel
The vessel arrives but the handling date remains uncertain Difference between ETA and cargo availability Berthing, handling, terminal and cargo-availability information Which operation is delayed Do not confirm pickup or delivery
The shipping line website and overseas agent provide different information Different update timing or information level Update time, booking and cargo status Whether the information is general service data or cargo-specific data Request an individual-booking response from the line or NVOCC
The change notice is forwarded without explaining its effect Operational impact remains unidentified Notice, workflow, customs, vehicle and receiving appointment Whether each party knows what must change Issue a revised notice showing affected items and decisions

Freight Forwarder Involvement

The five classifications used in this article are not established by law or industry-wide consensus. They serve as an analytical framework within this series to clarify the scope of freight forwarder involvement.

Classification Main Vessel-Schedule Involvement Typical Responsibility Review Key Documents and Facts Caution
Simple Intermediary Communicates planned and revised information received from the shipping line or NVOCC Whether entrusted inquiries and communications were performed accurately and promptly Receipt time, inquiry history, transmission record and response This role does not itself guarantee the vessel, ETD, ETA or delivery date
Cargo Transportation Service Provider Coordinates customs, drayage, CY delivery or domestic delivery within the contracted segment Scope of contracted transport and related operations Quotation, transport agreement, workflow, work instruction and change history Responsibility does not automatically extend to operational decisions outside the contracted segment
NVOCC / House B/L Issuer Manages the vessel, route, connection and arrival schedule as the carrier under the House B/L Notice, alternative arrangement and contractual obligations as the Contracting Carrier House B/L, applicable terms, Master Booking, route and change notices Distinguish the Actual Carrier's operation from the NVOCC's contractual responsibility
Door-to-Door Single Contractor Integrates pickup, export, ocean carriage, import, cargo pickup, delivery and final receipt Contracted segments, delivery commitment and rearrangement response Integrated transport agreement, workflow, delivery conditions, change history and cost approval Contractual status may remain even where physical operations are subcontracted
Agent / Coordinator for Specific Operations Coordinates specified booking, CY delivery, customs, D/O or delivery-schedule operations Specific entrusted tasks and reporting obligations Work instruction, email, booking, operational record and response history Responsibility for a specified task does not automatically extend to the entire transport

Contractual status, the actual scope of entrusted work, physical operations, business attributes, names appearing on transport documents, insurance status, applicable terms and mandatory law must be examined separately from the Standard Five Classifications. These matters do not constitute a sixth classification or any additional classification.

It is necessary to identify who is the Contracting Carrier, who is the Actual Carrier, who obtained the booking, who confirmed the vessel, voyage, ETD, ETA and CY cut-off, who arranged vanning, customs clearance and drayage, and who received each schedule change notice.

Responsibility cannot be determined solely from a party's description as a shipping line, NVOCC, prime freight forwarder, overseas agent, customs broker or delivery provider. The contract, transport documents, applicable terms, entrusted tasks, review time, notice time and response after the change became known must be examined.

Information to Share with the Shipper, Cargo Owner and Other Parties

Party Information to Share Decision Required by That Party Communication Caution
Shipper Vessel, voyage, ETD, CY cut-off, change and loading outlook Cargo preparation, alternative vessel, buyer communication and cost approval Distinguish the plan from actual loading
Cargo owner Vessel, ETA, berthing, handling, cargo availability and delivery outlook Inventory, sales, production, delivery and receiving arrangements Do not communicate the ETA as the delivery date
Shipping line or NVOCC Affected booking, review items and cargo-specific questions Vessel, space, connection, change and alternative Request an individual-booking response rather than only general schedule information
Customs broker Vessel, voyage, loading port, discharge port, ETD, ETA and revision history Declaration, amendment, inspection and permission planning Clearly withdraw obsolete information
Warehouse or vanning site CY cut-off, work date, empty container and delivery plan Labour, storage, operation and dispatch Do not confirm work solely from an unconfirmed vessel
Drayage provider Empty container, vanning, CY, deadline and revised plan Vehicle, waiting, cancellation and rescheduling Preserve notice time and cancellation conditions
Overseas agent Vessel, connection, ETA, Arrival Notice and cargo status Consignee communication, customs, D/O and delivery Distinguish a candidate vessel from actual loading
Delivery location Provisional delivery outlook, reason for change and next update Receiving slot, labour, storage and production planning Do not communicate an unconfirmed ETA as a delivery commitment

Common Misunderstandings

Misunderstanding Actual Approach Practical Caution
A vessel schedule is confirmed information It is planned information and may change during transport Continue reviewing revisions and actual events
The same vessel name means the same sailing The same vessel may operate several voyages Confirm the vessel and voyage together
No further review is required after the Booking Confirmation The vessel, deadlines and route may change after booking Review again before loading, after departure and before arrival
A later ETD automatically extends the CY cut-off The ETD and CY cut-off are managed separately Confirm the revised booking or terminal instruction
ETA is the cargo-availability date ETA is the vessel's estimated arrival Confirm berthing, handling, terminal availability and import permission
ETA is the delivery date Pickup, delivery and receiving conditions remain separate Recalculate the expected delivery date
First-leg departure confirms final arrival A transshipment service still requires loading on the connecting vessel Confirm connection, actual loading and final ETA
The shipping line website shows the status of the individual cargo General service information may differ from cargo-specific status Request booking, B/L or container-level confirmation
Forwarding the change notice completes the freight forwarder's response The effect on documents, customs, vehicles and delivery must be reviewed Identify the required decision and responsible party
All delay costs are payable by the shipping line or freight forwarder Allocation depends on the contract, cause, cost item, instructions and mitigation Separate the existence of the cost from recoverability

Example 1: A Different Voyage of the Same Vessel Is Reviewed

Assume that a container is booked from Yokohama to Singapore. The operator searches the shipping line website by vessel name and mistakenly uses the preceding voyage of the same vessel.

The incorrectly selected voyage has a Wednesday ETD, while the booked voyage has a Saturday ETD. The operator informs the shipper of the Wednesday departure, and the overseas side arranges warehouse receiving and delivery using that information.

The error is discovered when the voyage shown on the Booking Confirmation differs from the voyage shown in the draft B/L. A delivery-appointment amendment charge of JPY 50,000 is incurred.

The vessel name alone does not identify the relevant sailing. The booking number, voyage, loading port, discharge port and ETD must be reviewed together.

The freight forwarder should determine which source was used, whether the Booking Confirmation was reviewed and when the corrected information was sent to the shipper and overseas party.

The individual vessel and voyage linked to the booking should be used rather than the first sailing displayed in a general search result.

Example 2: A Later ETD Is Mistaken for an Extended CY Cut-off

Assume that export cargo from Tokyo to North America has an original Thursday ETD and a Monday 4:00 p.m. CY cut-off.

The shipping line website later shows a Saturday ETD. The shipper and freight forwarder assume that the CY cut-off will also move to approximately Wednesday.

However, the individual booking retains the Monday 4:00 p.m. cut-off. The container arrives at the CY on Tuesday morning, and no late gate is approved. The cargo is not loaded on the intended vessel.

The shipper argues that the cargo should have been accepted because the vessel was delayed by two days and requests payment of the resulting delay and emergency-airfreight cost.

The central issue is whether the ETD and CY cut-off were separately reviewed. A later vessel schedule does not necessarily change terminal receiving, stowage or yard deadlines.

The individual booking, cut-off notice, communication to the shipper, vehicle instruction and gate record should be arranged chronologically.

After a schedule revision, the ETD, CY cut-off, SI deadline, VGM deadline and receiving location must be reconfirmed separately.

Example 3: ETA Is Confirmed as the Delivery Date

Assume that imported machinery is scheduled to arrive at Kobe on October 8. The freight forwarder confirms factory delivery for October 9 based on the shipping line's ETA.

The vessel reaches the port area on October 8 but does not berth until October 10 because of congestion. Handling is completed on October 11, the cargo becomes available on October 12 and a suitable heavy vehicle is not available until October 14.

The delivery location had arranged labour for October 9, resulting in a receiving-appointment amendment charge of JPY 80,000.

ETA is the estimated vessel arrival, not the berthing, handling, terminal-availability, D/O, import-permission, vehicle or delivery date.

The freight forwarder may use the ETA for a provisional outlook, but final delivery requires review of berthing, handling, cargo availability, import permission, pickup, vehicle capacity and receiving conditions.

The vessel ETA, cargo-availability outlook, provisional delivery date and confirmed delivery date should be communicated separately.

When to Consult a Maritime Lawyer

Routine vessel-status review, schedule amendment or delivery rescheduling may not require immediate legal advice. Consultation with a lawyer experienced in maritime transport should nevertheless be considered in the following situations:

  • The parties dispute whether a particular vessel, ETD, ETA or delivery date was guaranteed
  • An incorrect schedule notice results in a substantial claim for alternative transport, contractual penalties or business interruption
  • The responsibilities of the shipping line, NVOCC, prime freight forwarder, overseas agent, shipper or cargo owner are complex
  • House B/L or Master B/L provisions concerning route change, alternative port, limitation or exclusion of liability are disputed
  • A Booking Confirmation or email is alleged to constitute a transport guarantee or special agreement
  • An L/C shipment deadline, B/L date, port of loading, port of discharge or transshipment term is affected
  • The receipt time, communication time or duty to review the schedule is disputed
  • Demurrage, Detention, storage or alternative transport costs are substantial
  • A claim-notice deadline, objection period or time bar is approaching
  • A party requests execution of an admission of liability, indemnity agreement, settlement or waiver

The Booking Confirmation, revised booking, vessel schedule, shipping line notices, terminal instructions, cargo tracking, B/L, customs records, vehicle and delivery appointments, additional costs and communications should be arranged in chronological order.

Decision Checklist

Review Stage Party to Contact Point to Confirm Action if a Problem Exists
Quotation and proposal Shipping line or NVOCC Route, frequency, direct or transshipment service, estimated ETD and ETA and lead time Compare the reliability and transit time of several options
Booking Shipping line or NVOCC Vessel, voyage, ports, ETD, ETA, CY cut-off and deadlines Clearly identify unresolved conditions
Cargo preparation Shipper, warehouse, customs broker and drayage provider Vanning, documents, permission, empty container and vehicle Recalculate the workflow from the CY cut-off
Before the CY cut-off Shipping line, terminal and customs broker Latest cut-off, receiving location, SI, VGM and export permission Rebuild the operation immediately after a change
Before loading Shipping line or NVOCC Vessel status, blank sailing, port omission, rollover and expected loading Confirm the replacement vessel and document changes
After departure Shipping line, NVOCC or overseas agent Actual loading, departure, transshipment port and connecting vessel Request cargo-specific confirmation
During transshipment Shipping line, NVOCC or overseas agent Arrival, discharge, connection, actual loading and departure Distinguish the planned connection from actual loading
Before arrival Shipping line, NVOCC, overseas agent and customs broker ETA, berthing, handling, Arrival Notice and D/O Communicate a provisional cargo-availability and delivery outlook
After arrival Terminal, customs broker and delivery provider Handling completion, terminal availability, import permission, pickup and vehicle Confirm the expected delivery date
When a change notice is received Notice issuer and related service providers Affected booking, changed item, reason, notice time and operational effect Separate confirmed and unresolved information
When additional costs arise Contractual counterparty, service provider and shipper or cargo owner Cost item, cause, amount, instruction, approval, terms and mitigation Obtain quotations and approvals and preserve evidence
When cargo damage is suspected Shipping line, NVOCC, insurer and surveyor Damage, cause, photographs, temperature, seal and discovery time Handle physical damage separately from the delay
When a liability dispute arises Contractual counterparty, insurer and maritime lawyer Contractual status, entrusted work, chronology, terms, loss and deadlines Do not admit liability immediately; preserve the records

Summary

A vessel schedule is planned operational information combining the vessel, voyage, shipping line, service, loading port, discharge port, ETD, ETA, CY cut-off, port rotation, transshipment port and connecting vessel.

It is not a confirmed operational result. It may change after booking because of port congestion, severe weather, fleet adjustment, blank sailing, rollover, port omission, port rotation change or a revised transshipment connection.

Planned information, revised information, cargo-status information and actual-event information should be kept separate. The vessel and voyage linked to the individual booking should be used rather than the vessel name alone.

On the export side, the ETD must be reviewed together with the CY cut-off, SI deadline, VGM deadline, customs, drayage and actual loading. On the import side, the ETA must be reviewed together with berthing, handling, the D/O, import customs, cargo pickup, vehicle capacity and receiving conditions.

For transshipment cargo, the first-leg vessel is not sufficient. The transshipment port, connecting vessel, connecting ETD, actual loading and final ETA must also be confirmed.

The freight forwarder should not merely forward a schedule-change notice. It should identify the effect on deadlines, documents, operations, delivery and costs and communicate confirmed, planned and under-review information separately.

The responsibility of a freight forwarder cannot be determined solely from its involvement in the vessel schedule. Its status as the Contracting Carrier or Actual Carrier, its position under the Standard Five Classifications, the actual scope of entrusted work, transport documents, applicable terms, review time, notice time and response after the change became known must be examined separately.

The existence of additional costs and the right to recover those costs from the shipping line, NVOCC, freight forwarder, shipper, cargo owner or another party are separate issues. Delay alone must also be distinguished from physical cargo damage.